List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. VESSEL TRACKING SYSTEM EQUIPMENT

    SBC: P F Newcomb & Associates            Topic: N/A

    N/A

    SBIR Phase II 1992 Department of Transportation
  2. Not Available

    SBC: CREARE LLC            Topic: N/A

    Not Available This project addresses the development of novel atmospheric retrieval and corrections methodology for air- or space-borne hyperspectral imaging that is based on a robust physical propagation model. Atmospheric retrieval is a classical inverse problem that

    SBIR Phase I 2000 Department of Transportation
  3. A RELIABLE LOCOMITIVE CAB ALERTER

    SBC: Technology International Incorporated of Virginia            Topic: N/A

    SEVERAL CONCEPTS ARE PROPOSED FOR LOCOMOTIVE CAB ALERTERS THAT CAN BE RETROFITTED TO ALERTER SYSTEMS ALREADY IN SERVICE. THE CONCEPTS INCLUDE A TOUCH SCREEN, WHICH REQUIRES TOUCHING A TARGET TO RESET THE TIMER OR TO RESPOND TO THE ALERTER LIGHT PROMPT. THE INITIAL LOCATION OF THE TARGET ON THE SCREEN IS AUTOMATICALLY SELECTED AT RANDOM. ANOTHER CONCEPT IS THE USE OF A TELEPHONE KEYPAD WITH LCD, WH ...

    SBIR Phase I 1992 Department of Transportation
  4. Fast Room Temperature Cure Adhesive for Fiber Optic Connector

    SBC: Advanced Material Systems            Topic: N/A

    Standard U.S. Navy fiber optic assemblies require that the fiber be bonded to the connector using an adhesive that is labor intensive and heat controlled (MIL-A-24792). Advanced Material Systems (AMS) proposes a study that could solve this problem through the development of an adhesive system that would cure at room temperature in less that 3 minutes and yet meet all of the in-service req ...

    SBIR Phase I 1996 Department of DefenseNavy
  5. Submarine Electrical Hull Penetrators/Connectors

    SBC: D. G. O'brien, Inc.            Topic: N/A

    Recent trends in submarine design indicate the need for-locating more electrical components, such as propulsion motors and actuators, outside the pressure hull. As a result, there is a need for electrical hull penetrators/connectors which can transfer high currents or high voltages through the submarine's pressure hull. We propose to review the capabilities and limitations of existing penetrator/ ...

    SBIR Phase I 1996 Department of DefenseNavy
  6. Unmanned Aerial Vehicle Electronic Decoy Payload

    SBC: Dedicated Electronics, Inc.            Topic: N/A

    Enemy forces can be crippled quickly at the beginning of a war by separating the enemies command and control structure from its combat forces and other elements of its defensive network. A false target generator has the potential to saturate or tie up an enemies air defense net and increase survivability of our own airborne assets. An unmanned aerial vehicle (UAV) is an optimum candidate for a dec ...

    SBIR Phase II 1996 Department of DefenseNavy
  7. N/A

    SBC: EXOTHERMICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  8. Micro Air-launched expandable Visibility Sonde

    SBC: NEPTUNE SCIENCES, INC.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of DefenseNavy
  9. N/A

    SBC: NEPTUNE SCIENCES, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  10. N/A

    SBC: NEPTUNE SCIENCES, INC.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of DefenseNavy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government