You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of a Modularized Linear Detector Array for use in High Energy Computed Tomography Applications

    SBC: AGILE TECHNOLOGIES INC.            Topic: N153132

    In this document, a proposed modular detector system, intended for used as part of an existing high energy computed tomography system is described. Each detector module would be comprised of a cadmium tungstate linear detector array (LDA) and a Varian PaxScan 1515DXT Digital Image Receptor. The proposed design would couple the bottom face of the LDA to the 1515DXT, which would allow the 1515DXT to ...

    SBIR Phase I 2016 Department of DefenseNavy
  2. Sensors and Algorithms for Fog Extenuation- SAFE

    SBC: PHELPS2020, INC            Topic: N161055

    Phelps2020 proposes a multi-sensor system (SAFE) that passively increases operational distances in the maritime environment in the presence of dense fog. The system comprises multiple modalities (EO, SWIR, LWIR) operating in various modes (temporal, multi-spectral, and polarized), and orchestrated via an optimized set of algorithms within a decision making fusion framework. Our solution involves t ...

    SBIR Phase I 2016 Department of DefenseNavy
  3. Quantifying Uncertainty in the Mechanical Performance of Additively Manufactured Parts Due to Material and Process Variation

    SBC: VEXTEC Corporation            Topic: N16AT004

    The Phase I objective is a proof of concept capability integrating process information, material properties and damage tolerance simulations into the Additive Manufacturing (AM) design certification process. VEXTEC has a toolbox of software and methods that consists of various software modules in multiple formats that are used to assess the durability of parts processed by traditional methods of c ...

    STTR Phase I 2016 Department of DefenseNavy
  4. CNT enhanced KineticCore FES system

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: N152118

    The introduction of USN electric ship initiatives and advanced weapons systems such as rail guns, lasers, and other future pulse loads to future warships creates power and energy demands that exceed what a traditional ship electric plant interfaces have been designed to provide. This creates the problem of satisfying a growing demand for stored energy, while working within the limited space availa ...

    SBIR Phase I 2016 Department of DefenseNavy
  5. Modular Boat Ramp to Launch and Retrieve Watercraft from Joint High Speed Vessel (JHSV)

    SBC: TECHNOLOGY ASSOCIATES, INC.            Topic: N152102

    Technology Associates, Inc. (TAI) proposal is for development of a TAI modular boat ramp concept (TAI-MBR) for Launch and Recovery (L&R) of watercraft from the Joint High Speed Vessel's (JHSV) stern. The TAI-MBR will rapidly L&R various manned and unmanned watercraft in less than 15 minutes and in sea state 3 (SS3) with wave heights of 3 to 5 ft. It will not rely on the use of the cargo crane for ...

    SBIR Phase I 2016 Department of DefenseNavy
  6. Application of Neural Networks for Pattern Recognition in Logistics Data

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    In this Phase I SBIR, Accurate Automation Corporation will prototype key component technologies for a neural network-based Logistic Support Assistant that will assist Navy Supply Management personnel in planning and forecasting of logistics efforts. Fully developed as part of a Phase II effort, this system will help ensure smooth continuity of performance even when personnel are reassigned. ...

    SBIR Phase I 1996 Department of DefenseNavy
  7. Accurate Automation Corporation Fuzzy Logic/ Neural Network Processor

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    In this project we will adapt our programmable neural network processor (NNP) into a Fuzzy/neural network processor (FNNP). Already having the commercially successful NNP, we begin this program with more than half the work completed. we will define and evaluate NNP architectural modifications to optimize both data flow and data processing for both fuzzy logic and neural network- Operations- we w ...

    SBIR Phase I 1996 Department of DefenseNavy
  8. Neural Network Figure of Merit Subsystem

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
  9. COMPUTER CONTROLLED MICROINDENTER SYSTEM

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    Incorporation of cleavage microcracks on otherwise crack free material is a new approach used in the fabrication of some microelectonics devices. This proposal describes the development of a new computer controlled microindenter system for the farication of microcracks on a crystalline substrate. System capabilities will include the introduction of two simultaneous Vickers indentations at precise ...

    SBIR Phase II 1996 Department of DefenseNavy
  10. Fast Room Temperature Cure Adhesive for Fiber Optic Connector

    SBC: Advanced Material Systems            Topic: N/A

    Standard U.S. Navy fiber optic assemblies require that the fiber be bonded to the connector using an adhesive that is labor intensive and heat controlled (MIL-A-24792). Advanced Material Systems (AMS) proposes a study that could solve this problem through the development of an adhesive system that would cure at room temperature in less that 3 minutes and yet meet all of the in-service req ...

    SBIR Phase I 1996 Department of DefenseNavy
US Flag An Official Website of the United States Government