You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Pipeline Integrity Process Management/Audit System
SBC: AECsoft USA Inc. Topic: N/AAs the OPS performs audits of the pipeline operators, pursuant to the Pipeline Safety Improvement Act of 2002 and Sub-part O of the newly released 49 CFR 192, the focus is no longer on the existence of a plan, rather, it is on the existence of a process, the completion of tasks defined within those processes and the documentation that supports and/or defines the decisions associated with said acti ...
SBIR Phase I 2004 Department of Transportation -
Software Package for Material Model Evaluation
SBC: APTEK, Inc. Topic: N/AThis Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...
SBIR Phase II 2004 Department of Transportation -
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
Digital Waveform-Based System for Acoustic Emission Measurement for Nondestructive Testing of Structural Steel
SBC: Digital Wave Corp. Topic: N/ADigital Wave Corporation proposed to develop a novel nondestructive testing (NDT) system for high speed acquisition and analysis of wide band acoustic emission (AE) waveforms. The system will provide the capability to detect, identify and locate crack growth in loaded steel structures. This system will incorporate the new high fidelity sensor developed by the Federal Highway Administration and a ...
SBIR Phase I 1996 Department of Transportation -
"Transportation Planning Decision Support Systems"
SBC: In Motion Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
STRUCTURES
SBC: Invocon Consultants Topic: N/AA NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...
SBIR Phase II 1992 Department of Transportation -
Field Energy Recoil Emission Technology (FERET)
SBC: INVOCON, INC. Topic: N/APassenger safety concerns have prompted the FAA to elicit energy-sensitive neutron detectors which do not rely on the time-of-flight method and are suitable for use in explosive detection systems. Invocon, Inc. proposes to design an inspection system consisting of an energy source and a detector. Designated FERET sytem, (Field Energy Recoid Emission Technology), it would detect substances identi ...
SBIR Phase I 1996 Department of Transportation -
INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS
SBC: Omega Point Laboratorytorie Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
An Inexpensive Structural Core Material for Composite Bridges
SBC: Polymer Bridge Systems, Inc. Topic: N/APolymer Bridge Systems, with over 8 years of research composite bridges, found that success hinges on being dollar-for-dollar cost competitive with steel and concrete. We founded the four "golden rules" that are required: the bridge must be: 1) factory build; 2) road transportable; 3) installed in 1 eight-hour day; and 4) be cost-competitive on an installed cost basis. This bridge will be buil ...
SBIR Phase I 1996 Department of Transportation -
N/A
SBC: Raymond & Lae Engineering, Topic: N/AN/A
SBIR Phase II 1999 Department of Transportation