You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CASE-BASED TIMING ASSESSMENT TOOL

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    THE MOST CRITICAL DEFICIENCY WITH CASE PRODUCTS AS APPLIED TO TIME-CRITICAL SOFTWARE DESIGN IS THEIR INABILITY TO ADEQUATELY SUPPORT THE TRADE-OFF PROCESS INVOLVING TIMING AND PERFORMANCE ISSUES. ONLY A FEW OF THE SO-CALLED REAL-TIME TOOLS SUPPORT THE ALLOCATION AND BUDGETING OF TIMING REQUIREMENTS. NONE OF THE AVAILABLE CASE TOOLS PROVIDE THE USER WITH ESTIMATES OF DELIVERED TIMING THAT ARE DERIV ...

    SBIR Phase II 1992 National Aeronautics and Space Administration
  2. A LOW PROFILE CRYOGENIC SCBA SYSTEM WITH PERSONAL COOLING AND WHOLE-BODY PROTECTIVE SUIT

    SBC: Aerospace Design & Development, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  3. NETWORK PROGRAMMING LANGUAGE NETWORK PROGRAMMING LANGUAGE

    SBC: Apeiron            Topic: N/A

    THE PROPOSED INNOVATION CONSISTS OF A PROGRAMMING ENVIRONMENT WHERE EXECUTION TAKES PLACE THROUGHOUT A (PERHAPS HETEROGENEOUS) NETWORK OF COMPUTING DEVICES. FROM THE PROGRAMMER'S POINT OF VIEW, THE LANGUAGE APPEARS AS AN ICONIC OBJECT FLOW LANGUAGE (SUCH AS PROGRAPH) WITH A FEW EXTENSIONS FOR ATTACHING SALIENCE TO SELECTED PROCESSES. NOKNOWLEDGE OF THE NETWORK ARCHITECTURE OR PROTOCOL IS REQUIRED ...

    SBIR Phase I 1992 National Aeronautics and Space Administration
  4. SPACE STATION STORAGE DATABASE MANAGEMENT SYSTEM

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 National Aeronautics and Space Administration
  5. Training Hardware Management System

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 National Aeronautics and Space Administration
  6. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  7. AIRBORNE SYSTEM FOR REMOTE SENSING OF SOIL AND SUBSOIL PARAMETERS

    SBC: Barringer Patents Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 National Aeronautics and Space Administration
  8. TACTILE DISPLAYS FOR WHOLE-ARM MANIPULATORS

    SBC: Begej Corp.            Topic: N/A

    N/A

    SBIR Phase I 1992 National Aeronautics and Space Administration
  9. NASA AEROSPACE CERAMICS AND BONE

    SBC: BIOMEDICAL ENTERPRISES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  10. Active Segmented Mirror

    SBC: Blue Line Engineering Co            Topic: N/A

    N/A

    SBIR Phase II 1996 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government