You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  2. A Compact Neutron Spectrometer Based Upon Inorganic Hydrogenous Scintillators

    SBC: Merril Corporation of Utah, dba MSI Photogenics            Topic: N/A

    Mission Support proposes to develop a compact, self-contained neutron spectrometer for MeV neutrons that will be suitable for the detection of the nitrogen, oxygen and carbon components in explosive materials. Neutron-resonance-radiographic techniques will be employed to detect the presence of these materials through their distinctive total-neutron-cross-section resonances. The detector insures ...

    SBIR Phase I 1996 Department of Transportation
  3. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  4. Field Energy Recoil Emission Technology (FERET)

    SBC: INVOCON, INC.            Topic: N/A

    Passenger safety concerns have prompted the FAA to elicit energy-sensitive neutron detectors which do not rely on the time-of-flight method and are suitable for use in explosive detection systems. Invocon, Inc. proposes to design an inspection system consisting of an energy source and a detector. Designated FERET sytem, (Field Energy Recoid Emission Technology), it would detect substances identi ...

    SBIR Phase I 1996 Department of Transportation
  5. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  6. An Expert System for Aquaculture Environment Control

    SBC: Ortech Engineering Inc.            Topic: N/A

    This Small Business Innovation Research Phase I project will explore the use of a fuzzy logic based expert system in a closed loop control system for nitrate removal (denitrification) from large aquaculture systems. Nitrate is naturally generated by the bio-mass in any aquatic system. Current techniques for the control of nitrate levels are almost exclusively based on water exchange. For large ...

    SBIR Phase II 1996 Department of Commerce
  7. An Inexpensive Structural Core Material for Composite Bridges

    SBC: Polymer Bridge Systems, Inc.            Topic: N/A

    Polymer Bridge Systems, with over 8 years of research composite bridges, found that success hinges on being dollar-for-dollar cost competitive with steel and concrete. We founded the four "golden rules" that are required: the bridge must be: 1) factory build; 2) road transportable; 3) installed in 1 eight-hour day; and 4) be cost-competitive on an installed cost basis. This bridge will be buil ...

    SBIR Phase I 1996 Department of Transportation
  8. Advanced Concept Basalt Fiber Reinforcement for Concrete

    SBC: Research & Technology Corp            Topic: N/A

    Extensive research (Ukraine) has shown that high strength continuous fibers of basalt can be produced. These fibers are inexpensive and have exceptionally high strength, stiffness and corrosion resistance. Basalt is a naturally occurring volcanic mineral, consisting a variety concentration of oxides. The product envisioned is a low-cost, corrosion resistant replacement for steel bar in reinforc ...

    SBIR Phase I 1996 Department of Transportation
  9. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  10. Fatigue Crack Detection Via Differential Thermography

    SBC: Stress Photonics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
US Flag An Official Website of the United States Government