You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  2. Data Compression Techniques for Portable Computing Environments

    SBC: Fastman, Inc.            Topic: N/A

    The capability to transmit digitized reports to rear echelon forces during an ongoing battle is a critical command and control component. However, projections of the amount of digital traffic over transmissions links raise the distinct possibility that the demand for digital information tranmitted across the battlefield will outstrip channel capacity. Being able to reduce the quantity of traffic ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  3. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  4. Field Energy Recoil Emission Technology (FERET)

    SBC: INVOCON, INC.            Topic: N/A

    Passenger safety concerns have prompted the FAA to elicit energy-sensitive neutron detectors which do not rely on the time-of-flight method and are suitable for use in explosive detection systems. Invocon, Inc. proposes to design an inspection system consisting of an energy source and a detector. Designated FERET sytem, (Field Energy Recoid Emission Technology), it would detect substances identi ...

    SBIR Phase I 1996 Department of Transportation
  5. Transportation Planning Uses of Commercial Data

    SBC: Kjs Associates, Inc.            Topic: N/A

    For more than three decades, transportation planners have relied on survey data collected specifically for the development of travel forecasting models, which are expensive to collect and maintain on an ongoing basis. There is a plethora of data collected for other reasons that could potentially support transportation planning which is becoming more accessible through technological advances. Use ...

    SBIR Phase I 1996 Department of Transportation
  6. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  7. DETECTION AND QUANTIFICATION OF SUBSURFACE CORROSION USING IMPROVED MAGNETO-OPTIC/EDDY-CURRENT IMAGING AND IMAGE PROCESSING

    SBC: PHYSICAL RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  8. An Inexpensive Structural Core Material for Composite Bridges

    SBC: Polymer Bridge Systems, Inc.            Topic: N/A

    Polymer Bridge Systems, with over 8 years of research composite bridges, found that success hinges on being dollar-for-dollar cost competitive with steel and concrete. We founded the four "golden rules" that are required: the bridge must be: 1) factory build; 2) road transportable; 3) installed in 1 eight-hour day; and 4) be cost-competitive on an installed cost basis. This bridge will be buil ...

    SBIR Phase I 1996 Department of Transportation
  9. WASH DOTS Invasive Plant Protection Wash Units

    SBC: Kennedy, Sheilah A            Topic: N/A

    Develop strong prevention tool addressing increasing invasive species issues for State DOT construction maintenance departments and projects to easily rapidly efficiently to be used by all State DOT.

    SBIR Phase I 2008 Department of Transportation
  10. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
US Flag An Official Website of the United States Government