You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SPARE PART SERIAL TRACKING
SBC: Advanced Marine Enterprises, Topic: N/AIT IS PROPOSED THAT A PLAN TO EVALUATE, SELECT, AND TEST (FOR ECONOMIC FEASIBILITY) AN ELECTRONIC SERIAL TRACKING SYSTEM BE DEVELOPED. MORE SPECIFICALLY, A MARKET SURVEY WILL BE CONDUCTED TO DETERMINE THE AVAILABLE ELECTRONIC TRACKING SYSTEMS. NEXT, THE CHARACTERISTICS AND PERFORMANCE OF EACH TRACKING SYSTEM WILL BE DOCUMENTED. THE LIKELY OPERATING ENVIRONMENTS OF THE TRACKING SYSTEM WILL THEN BE ...
SBIR Phase II 1986 Department of DefenseNavy -
CORRELATION OF FLIGHT PURPOSE CODES WITH FLIGHT MANEUVERS DATA FOR IMPROVED FATIGUE ESTIMATES IN SAFE PROGRAM
SBC: Aerostructures Inc. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseNavy -
CHARACTERIZATION OF DAMAGE IN COMPOSITE ROCKET MOTOR CANISTERS
SBC: American Research Corporation of Virginia Topic: N/ATHE INHERENT ANISOTROPY AND INHOMOGENEITY OF COMPOSITE MATERIALS MAKE DAMAGE DETECTION AND CHARACTERIZATION DIFFERENT THAN THAT OF HOMOGENEOUS ISOTROPIC MATERIALS. BOTH IN QUALITY ASSURANCE AND MAINTAINABILITY, TESTS BASED ON STRONG AND WELL UNDERSTOOD PRINCIPLES MUST BE ESTABLISHED IN ORDER TO DETECT AND QUANTIFY DAMAGE. THE DATA FROM THESE TESTS COULD SERVE AS A BASIS FOR ACCEPT-REJECT CRITERIAL ...
SBIR Phase II 1986 Department of DefenseNavy -
PROJECT OBJECTIVES ARE TO INVESTIGATE RESTRUCTURING DD FORM 1423 TO PROMOTE TAILORING OF DATA REQUIREMENTS TO THE PARTICULAR NEEDS OF AN ACQUISITION PROJECT AND ESTABLISH SYSTEMATIC GUIDELINES FOR IMPLEMENTATION.
SBC: Angstrom Topic: N/APROJECT OBJECTIVES ARE TO INVESTIGATE RESTRUCTURING DD FORM 1423 TO PROMOTE TAILORING OF DATA REQUIREMENTS TO THE PARTICULAR NEEDS OF AN ACQUISITION PROJECT AND ESTABLISH SYSTEMATIC GUIDELINES FOR IMPLEMENTATION. A LOGICAL AND ORDERED METHODOLOGY WILL BE DEVELOPED DURING THE PHASE I STUDY TO ACCOMPLISH THESE OBJECTIVES.
SBIR Phase I 1986 Department of DefenseNavy -
VLF TRANSMIT ANTENNA DESIGN
SBC: ASTRON WIRELESS TECHNOLIGIES, INC. Topic: N/AA TRANSPORT VHF (25-30 KHZ) TRANSMIT SYSTEM ANTENNA WAS STUDIED. SEVERAL INNOVATIVE CONCEPTS WERE ANALYZED AND EVALUATED BOTH IN THE LABORATORY AND THE ANTENNA RANGE. ALL MEASUREMENTS ARE MODELED AT 2.5 TO 3 MHZ. THE TECHNIQUES INCLUDE: LOOP, MONOPOLE (INCLUDE SLOW WAVE VERSIONS), CENTER-FED VERTICAL MONOPOLE, AND GROUND/AIR INTERFACE DIPOLE. THE PROGRAM STRESSED ANTENNAS WHICH COULD OPERATE IN AR ...
SBIR Phase II 1986 Department of DefenseNavy -
LIGHTWEIGHT BROADBAND SHIPBOARD HIGH FREQUENCY ANTENNA
SBC: ASTRON WIRELESS TECHNOLIGIES, INC. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseNavy -
INTELLIGENCE SIGNAL PROCESSING SYSTEMS
SBC: CARLOW INTERNATIONAL, INC. Topic: N/ATHE OBJECTIVE OF THIS PROJECT IS TO DEVELOP MAN/MACHINE INTERFACE DESIGN GUIDELINES FOR SIGNAL PROCESSING AND INFORMATION MANAGEMENT SYSTEMS THAT EMPLOY ARTIFICIAL INTELLIGENCE (AI) TECHNOLOGY. HOWEVER POWERFUL A COMPUTATIONAL TOOL AI MAY PROVE TO BE, THE ULTIMATE VALUE TO THE SYSTEM USER WILL STILL BE A FUNCTION OF THE QUALITY OF THE MAN/MACHINE INTERFACE. USERS WILL EXPECT THE OPERATION OF AN AI ...
SBIR Phase I 1986 Department of DefenseNavy -
THE SUCCESSFUL INTRODUCTION OF AI TECHNOLOGY INTO SHIPBOARD DECISION MAKING HAS BEEN HINDERED BY THE NEED FOR REAL-TIME REASONING WITH INCOMPLETE AND INCONSISTENT DATA, RESOLUTION OF CONFLICTS BETWEEN CONFLICTING OBJECTIVES, INTEGRATION OF HIGH LEVEL
SBC: Decision Science Associates Topic: N/ATHE SUCCESSFUL INTRODUCTION OF AI TECHNOLOGY INTO SHIPBOARD DECISION MAKING HAS BEEN HINDERED BY THE NEED FOR REAL-TIME REASONING WITH INCOMPLETE AND INCONSISTENT DATA, RESOLUTION OF CONFLICTS BETWEEN CONFLICTING OBJECTIVES, INTEGRATION OF HIGH LEVEL SUBSYSTEMS WITH SYSTEMS FOR SIGNAL ANALYSIS, AND AN ADAPTIVE HUMAN-COMPUTER INTERFACE. DSC PROPOSES TO TEST THE HYPOTHESIS THAT SOLUTIONS FOR THESE P ...
SBIR Phase I 1986 Department of DefenseNavy -
HAUL HF COMMAND/DATA LINK FOR BUOYS
SBC: Defense Systems Inc. Topic: N/APRESENT DATA RECOVERY FROM ASW BUOYS REQUIRES THE PRESENCE OF P-3 AIRCRAFT. ALTERNATIVELY, SOME SATELLITE DATA READOUT CAPABILITY EXISTS, BUT TIDBIT RATE PER SATELLITE PASS IS TOOLOW, AND IT IS NOT REAL TIME. WE PROPOSETHE DEVELOPMENT OF A REAL TIME 2000 MILE HF DATA LINK FOR REMOTE BUOYS. A PRACTICAL HF BUOY LINK MUST USE SHORT NARROWBAND ATENNAS THAT CAN BE TUNED ACROSS THE BAND TO THE OPTIMUM F ...
SBIR Phase II 1986 Department of DefenseNavy -
DURING AN ATTACK ON A NAVAL BATTLE GROUP, THERE WILL BE A CONSIDERABLE AMOUNT OF INFORMATION TO BE ABSORBED AND ACTED UPON BY THE EW OPERATOR IN A SHORT TIME AND UNDER STRESSFUL CONDITIONS.
SBC: DIGITAL SIGNAL CORP. Topic: N/ADURING AN ATTACK ON A NAVAL BATTLE GROUP, THERE WILL BE A CONSIDERABLE AMOUNT OF INFORMATION TO BE ABSORBED AND ACTED UPON BY THE EW OPERATOR IN A SHORT TIME AND UNDER STRESSFUL CONDITIONS. THE INFORMATION FROM MANY SENSORS MUST BE CORRELATED SUCH AS OWNSHIP ESM DATA, MISSILE LIBRARY DATA, ECM ASSET STATUS, WEATHER DATA, AND RADAR DATA, AS WELL AS DATA FROM OTHER SHIPS AND AIRCRAFT. THIS INFORMATI ...
SBIR Phase I 1986 Department of DefenseNavy