You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPOSITE FLAT SURFACE IN HYPERSONIC FLOW REGIME

    SBC: Advanced Technologies & Testin            Topic: N/A

    IN HYPERSONIC CRUISE, THE OUTER SURFACE OF A VEHICLE MADE OF A COMPOSITE MATERIAL ABLATES. THE ABLATED PARTICLES PENETRATE INTO THE BOUNDARY LAYER AFFECTING THE FLOW DYNAMICS AS WELL AS RADIATIVE AND CONVECTIVE HEAT TRANSFER TO AND FROM THE VEHICLE. THE AUTHORS PROPOSE TO PERFORM THEORETICAL ANALYSIS OF RADIATIVE AND CONVECTIVE HEAT TRANSFER IN A TURBULENT BOUNDARY LAYER OF HEAT RADIATION SCATTERI ...

    SBIR Phase I 1986 Department of DefenseAir Force
  2. PROPERTIES IN THE 1-10 KILOBAR PRESSURE REGION

    SBC: Applied Research Associates, Inc.            Topic: N/A

    GEOLOGIC MATERIAL PROPERTY REQUIREMENTS FOR NUMERICAL CALCULATION OF AN EXPLOSIVE EVENT DEPEND ON SEVERAL FACTORS, INCLUDING: THE PEAK PRESSURE EXPECTED OR ACHIEVED, THE GEOMETRY OF LOADING, AND THE TYPE OF CALCULATION BEING PERFORMED. ADDITIONALLY, THE CLASS OF GEOLOGIC MATERIAL INVOLVED; E.G., SAND VERSUS CLAY VERSUS ROCK, WILL DICTATE REQUIREMENTS BASED ON WHAT ARE ANTICIPATED TO BE THE IMPORTA ...

    SBIR Phase I 1986 Department of DefenseAir Force
  3. LOW-COST INDICATOR AND DOSIMETER FOR WARFARE GASES

    SBC: Coal Gas Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  4. INSULAR GUIDE INTEGRATED PULSE TRANSCEIVER FOR MILLIMETER WAVE TERMINAL GUIDANCE

    SBC: Epsilon Lambda Electronics Corp.            Topic: N/A

    THE EFFECTIVENESS OF NON-NUCLEAR MUNITIONS AND ARMAMENTS IS ENHANCED IF TERMINAL GUIDANCE IS PROVIDED. ILLUMINATION OF THE TARGET FROM A SELF-CONTAINED TRANSMITTER PROVIDES THE GREATEST MISSION FLEXIBILITY. THE USE OF MILLIMETER WAVELENGTH TERMINAL GUIDANCE TARGET SEEKERS IS NOW UNDER FAVORABLE CONSIDERATION BECAUSE OF SUPERIOR PERFORMANCE RELATIVE TO OPTICAL WAVELENGTH SYSTEMS IN ADVERSE BATTLEFI ...

    SBIR Phase II 1986 Department of DefenseAir Force
  5. MILLIMETER WAVE SEEKER APPLICATION

    SBC: Epsilon Lambda Electronics Corp.            Topic: N/A

    THE GUIDANCE OF SMALL MUNITIONS AND MISSILES USING SEEKER FRONT ENDS AT MILLIMETER WAVE LENGTHS HAS GAINES INCREASING DEVELOPMENT ATTENTION. MILLIMETER SEEKERS HAVE ADVANTAGES IN TERMS OF GROUND CLUTTER REJECTION AND OTHER BATTLE FIELD CONDITIONS (SMOKE AND DUST). THE MAJOR PROBLEM PLAGUEING THESE SYSTEMS TO DATE HAS BEEN THE HIGH COST DRIVEN BY THE INABILITY TO INTEGRATE AND MASS PRODUCE. MICROST ...

    SBIR Phase I 1986 Department of DefenseAir Force
  6. SPACECRAFT HEAT REJECTION METHODS: ACTIVE AND PASSIVE HEAT TRANS FER FOR ELECTRONIC SYSTEMS

    SBC: Triangle Research and Development Corporation            Topic: N/A

    IT IS PROPOSED TO INVESTIGATE THE APPLICATION OF AN INNOVATIVE METHOD FOR SPACECRAFT THERMAL ENERGY MANAGEMENT AS WELL AS ENHANCED HEAT TRANSFER AND STORAGE IN ELECTRONIC SYSTEMS USING A TWO-COMPONENT SLURRY CONTAINING A MICROENCAPSULATED, PHASE-CHANGE MATERIAL (PCM). A DEMONSTRATION MODEL OF A THERMAL MANAGEMENT SYSTEM CONTAINING BOTH A PRIMARY BUSS AND A SECONDARY LOOP WILL BE DESIGNED, FABRICAT ...

    SBIR Phase II 1986 Department of DefenseAir Force
US Flag An Official Website of the United States Government