You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. REMOVAL OF AUTOMOTIVE POLLUTANTS USING NEW METAL-SUPPORTED METAL CATALYST

    SBC: Accel Catalysis Inc.            Topic: N/A

    A NEW TECHNIQUE IS PROPOSED FOR THE PREPARATION OF METAL-SUPPORTED METAL (MSM) CATALYSTS. THE KEY FEATURE OF THIS TECHNIQUE INVOLVES THE PREPARATION OF A THIN LAYER OF POROUS METAL ON TOP OF A METAL SUBSTRATE SUCH THAT THE POROUS METAL SURFACE IS AN INTEGRAL PART OF THE METAL SUPPORT. SUBSEQUENT INTEGRATION OF PT AND RH ON THE POROUS METAL SURFACE WILL PRODUCE THE MSM CATALYST. THIS CATALYST IS US ...

    SBIR Phase I 1993 Environmental Protection Agency
  2. Pressure-Based Interactive Training System

    SBC: Breakthrough            Topic: N/A

    The long-term goal is to develop a commercially available product which, by transducing force sensed from oral structures or other body parts, can provide diagnostic and therapeutic information for conditions arising from motor impairment, particularly speech disorders. The aims of the Phase I project are (1) to develop interactive software to interface with the Iowa Oral Performance Instrument (I ...

    SBIR Phase I 1993 Department of Health and Human Services
  3. Development and Demonstration of a Non-hydraulic Actuator for Application in Active and/or Semi-active Suspension Systems

    SBC: Engineering Development Corp            Topic: N/A

    A program for the preliminary design, prototype construction, and bench testing of a linear pneumatic suspension strut for application in non-hydraulic combat vehicle suspension systems is presented. The proposed suspension strut system components include an air spring, accumulator, and variable size orifices for the active control of strut dynamic performance. Strut natural frequency, damping rat ...

    SBIR Phase I 1993 Department of DefenseArmy
  4. Headmouse: A Head Direction, User-Computer Interface

    SBC: Eyetech Corp.            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  5. HEADMOUSE: A HEAD DIRECTION USER-COMPUTER INTERFACE

    SBC: Pantech Inc.            Topic: N/A

    HEADMOUSE IS AN INEXPENSIVE MICROPROCESSOR-CONTROLLED INFRARED-LIGHT-BASED SYSTEM THAT INDICATES HEAD POSITION IN REAL-TIME, SO AS TO ENABLE A COMPUTER USER TO CONTROL CURSOR MOVEMENT ON A COMPUTER DISPLAY BY HEAD MOVEMENT WITHOUT ANY HEAD CONSTRAINTS OR HEAD MOUNTED APPARATUS (GLASSES, HELMET, ETC.). BY ACTIVATING THE SYSTEM USING A DESIGNATED KEY ON A STANDARD KEYBOARD OR BY USING A FOOT-OPERATE ...

    SBIR Phase I 1993 National Science Foundation
US Flag An Official Website of the United States Government