You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Recovery Act- Advanced Technology High Efficiency Low Cost Small Turbine for DG and CHP

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: 04d

    Efficient and environmentally friendly power generation is a national goal, toward which small gas turbines could contribute: however, to date small gas turbines (300kW to 2,000kW) have played no significant role in power generation due to their relatively poor efficiency and high cost when compared to diesel and gas fueled spark ignition engines. Candent Technologies is developing an innovative ...

    SBIR Phase I 2010 Department of Energy
  2. Recovery Act- Advanced Technology High Efficiency Low Cost Small Turbine for DG and CHP

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: 04d

    Efficient and environmentally friendly power generation is a national goal. While large scale power plants are demonstrating thermal efficiencies of 50%, the cost and environmental impact of increasing the size of current power plants and expansion of the grid to distribute this power are making this approach increasingly difficult and expensive. Alternative distributed power gen systems driven by ...

    SBIR Phase II 2010 Department of Energy
  3. Grid 2.0: Collaboration and Sharing on the Grid

    SBC: GALOIS, INC.            Topic: 54c

    Grid computing, the application of many loosely-coupled computers in federation to provide shared resources makes significant compute or storage capabilities accessible to distributed teams of researchers. In doing so, it also poses a challenge: How do distributed teams collaborate effectively with these resources? This project will determine how best to apply social and collaboration software ...

    SBIR Phase II 2010 Department of Energy
  4. Improved Symbol Resolution for Portable Build Systems

    SBC: GALOIS, INC.            Topic: 41e

    Modern High Performance Computing utilizes a variety of different hardware and software platforms. These differences make it difficult to develop reusable components, which lead to a significant decrease of productivity. Our goal is to investigate the design of portable build systems that are simple, yet sufficiently robust with respect to symbol resolution, so that they are able to adapt and buil ...

    SBIR Phase I 2010 Department of Energy
  5. A Deployable, Robust File System for Parallel I/O

    SBC: GALOIS, INC.            Topic: 41d

    When considering high-performance parallel computers, it is easy to overlook the importance of disk storage. In this proposal, we seek to address the topic of disk storage for parallel computers, and create a deployable, robust file system that will reduce downtime due to faults and increase productivity through improved system performance. For this project, Galois will take a synthesis approach, ...

    SBIR Phase I 2010 Department of Energy
  6. Recovery Act- Reducing Energy and Carbon Intensity in Oil Refining

    SBC: INNOVATIVE ENERGY SOLUTION            Topic: 09d

    As a toxic waste generated during the processing of oil and natural gas, hydrogen sulfide must be disposed of in an environmentally benign manner. Unfortunately the present disposal method, the Claus process, only extracts the sulfur content while wasting the much more valuable hydrogen portion. In addition, it is capital intensive. Throughout the industry, the Claus process is known as a tool to ...

    SBIR Phase I 2010 Department of Energy
  7. Performance and Energy Management in High Performance Computing Systems Using Application-Level Behavioral Attribute Driven Techniques

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: 36a

    The objective of the proposed effort is to characterize High Performance Computing (HPC) subsystem interactions into meaningful metrics and correlates and, determine the correlations between high-level application behavioral metrics to power consumption in HPC systems. The proposed effort will also evaluate the potential effectiveness of using the correlates as inputs to resource management and j ...

    SBIR Phase I 2010 Department of Energy
  8. Recovery Act- Controller for Charging/Storage System

    SBC: Peregrine Power LLC            Topic: 07b

    Pluggable EVs will represent a substantial electrical load that must be served when most advantageous in terms of price and grid stress. However, PEVs can also become a resource themselves if the battery storage can be used to support the grid or the customer

    SBIR Phase I 2010 Department of Energy
  9. Recovery Act- Controller for Charging/Storage System

    SBC: Peregrine Power LLC            Topic: 07b

    The nation

    SBIR Phase II 2010 Department of Energy
  10. High Efficiency, Large-Area, 1550 nm InGaAs Photodiodes

    SBC: VOXTEL, INC.            Topic: N/A

    A back-illuminated planar InGaAs photodiode tested to have 95% quantum effiiency (QE) at 1550 nm, area greater than 1 mm2, low capacitance (125 MHz) will be improved. Although the existing Phase I device exhibited bulk material dark current generation better than commercially available devices, the sidewall-generated dark current was found to dominate the noise equiva ...

    SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government