You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Power Management for Energy Resiliency

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A224015

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  2. Understanding and optimizing roll-to-roll manufacturing of high-strength, transparent polymer composite films

    SBC: TESSELLATED INC            Topic: A21CT025

    Our team has produced composite thin films with the highest reported tensile strengths.  These films have been produced using roll-to-roll manufacturing techniques that can be adapted to current manufacturing lines. Small amounts of thermally reduced graphene oxide (tr-GO) particles (1% by wt) can be added to a ultra high molecular weight polyethylene matrix to produce thin films with tensile str ...

    STTR Phase I 2022 Department of DefenseArmy
  3. Rapid Aeroservoelastic Design Framework for Morphing Unmanned Aerial Systems (RADMUAS)

    SBC: ANALYSWIFT, LLC            Topic: A22BT008

    There are currently over ten thousand Unmanned Aerial Systems (UAS’s) in military operations in support of domestic training events and overseas contingency missions for their versatility in meeting the Warfighters’ requirements, including intelligence, surveillance and reconnaissance. The mission profile of UAS’s typically involves multiple segments, such as releasing from storage, dashing, ...

    STTR Phase I 2022 Department of DefenseArmy
  4. Development of an Autonomous Off-Road Ground Vehicle Simulator

    SBC: Advanced Science And Automation Corp            Topic: A20BT006

    The Objective of this STTR project is to develop the Autonomous Vehicle Simulation Platform (AVSP). AVSP will virtually test how teams of autonomous interconnected wheeled and tracked ground vehicles operating on various kinds of deformable terrains interact with each other and their environment. AVSP will simulate the input from various sensors carried by the vehicles including cameras, Lidar, ra ...

    STTR Phase I 2021 Department of DefenseArmy
  5. 3D Woven Composite Mortar Baseplate

    SBC: T.E.A.M., INC.            Topic: A214006

    Redacted

    SBIR Phase I 2021 Department of DefenseArmy
  6. Wide Bandgap Bi-Directional Converter

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A214030

    Redacted

    SBIR Phase I 2021 Department of DefenseArmy
  7. Dual-Use Al-Li Alloy Fuel for Solid Fuel Ramjets and Space Launch Platforms

    SBC: Adranos Inc            Topic: A19137

    Extending the range of missile and firing systems is at the core of the United States Army’s top modernization priority, Long Range Precision Fires (“LRPF”). Adranos, Inc. (“Adranos”) has made a substantial advancement towards accomplishing LRPF goals with its high-performance solid rocket propellant called ALITEC. ALITEC utilizes an aluminum-lithium alloy (“Al-Li”) fuel that provide ...

    SBIR Phase I 2020 Department of DefenseArmy
  8. EMBRS: Energetic Material Battery and Reserve Power Systems

    SBC: Next Offset Solutions, Inc.            Topic: A19147

    The proposed effort seeks to develop Energetic Material Battery and Reserve Power Systems (EMBRS) for munition power sources and related systems that are based upon metal-based energetic composite powders, which consist of two metals that are mechanically mixed at the nanoscale and are capable of self-propagating reaction while contained within a compartmentalized metallic shell. The effort will s ...

    SBIR Phase I 2020 Department of DefenseArmy
  9. Isogeometric Analysis Methods for High Fidelity Mobility Applications

    SBC: YB NUMERICS, INC.            Topic: A19BT006

    Advanced numerical simulations of fluid flow and solid/structural mechanics are often used to assess the vehicle or engine performance, to identify the mechanical factors that contribute to the shortening of their life span, and to suggest design modifications that improve efficiency and durability. The latter often results in significant cost savings to the DoD. As the vehicle and engine designs ...

    STTR Phase I 2020 Department of DefenseArmy
  10. Pose-Invariant Probabilistic Face Recognition

    SBC: VISION SYSTEMS INC            Topic: A20074

    Modern deep learning-based face recognition systems perform at or above human levels on high quality frontal imagery, but their performance suffers significantly on more operationally relevant imagery with confounding factors such as extreme pose.  This performance degradation is based on two primary shortcomings: poor match between training and test-time image data, and failure to model inherent ...

    SBIR Phase I 2020 Department of DefenseArmy
US Flag An Official Website of the United States Government