You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Preparing New Internet Reading Courseware: READY 2000

    SBC: Interactive Knowledge, Inc.            Topic: N/A

    Not Available We propose a comprehensive program to develop a mathematical characterization of clutter environments in SAR imagery. In contrast to conventional characterizations of SAR clutter, which use simple statistical models for targets and background to predict the receiver operation characteristics of front-end detectors (e.g., CFAR algorithms), we develop a more general notion of clutter ...

    SBIR Phase I 1999 Department of Education
  2. VCSEL/Waveguide Structures for RF Photonics Applications

    SBC: OPTICOMP CORP.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseDefense Advanced Research Projects Agency
  3. INTELLIGENT CONTROL OF SEMICONDUCTOR MANUFACTURING PROCESSES

    SBC: 3d Informatics            Topic: N/A

    AN INTELLIGENT EQUIPMENT ARCHITECTURE FOR CLUSTER AND IN-SITU SEMICONDUCTOR MANUFACTURING PROCESSES IS PROPOSED. IT HAS TWO COMPONENTS: (1) MANUFACTURING EQUIPMENT - EQUIPMENT HARDWARE AND SENSORS, AND (2) INTELLIGENT EXPERT WORKSTATION - A HYBRID AI/NEURAL NETWORK EXPERT SYSTEM. THE INTELLIGENT CONTROL SCHEME IN THE INTELLIGENT EXPERT SYSTEM HAS THE FOLLOWING FEATURES: (1) EQUIPMENT/PROCESS MODEL ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  4. A NOVEL SPRING-CLUTCH STABILIZER TO AID WHEELCHAIR USERS IN TRAVERSING ENVIRONMENTAL BARRIERS

    SBC: Triangle Research and Development Corporation            Topic: N/A

    A PHASE I PROGRAM IS PROPOSED TO DEVELOP A FRONT CASTER STABILIZING DEVICE THAT, WHEN INSTALLED ONTO A COMMON WHEELCHAIR TO VEER DOWNHILL WHEN TRAVERSING A SLOPE WAS IDENTIFIED IN A NATIONAL REPORT ON TECHNOLOGY FOR THE HANDICAPPED AS A SIGNIFICANT PROBLEM FOR WHEELCHAIR MOBILITY. COMBATING THIS TENDENCY CAN EXHAUST INDIVIDUALS PROPELLING A WHEELCHAIR ACROSS A SLOPE AS SLIGHT AS TWO DEGREES REQUIR ...

    SBIR Phase I 1990 Department of Education
US Flag An Official Website of the United States Government