You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Development of Fiber Optic Approach Lighting Systems Part One: Development of LED Threshold Lights
SBC: Lighting Innovations, LLC Topic: N/AThe incandescent lamps used in the green threshold lamps that form a line on the front end of an airport runway, have relatively short lives and require constant maintenance. The green filters used in front of the lamps transmit only about 20% of the light. Green light emitting diodes (LEDs) have been improved recently and are reaching brightness levels making it possible to use them in traffic ...
SBIR Phase II 2001 Department of Transportation -
Development of Fiber Optic Approach Lighting Systems Part One: Development of LED Threshold Lights
SBC: Lighting Innovations, LLC Topic: N/AThe incandescent lamps used in the green threshold lamps that form a line on the front end of an airport runway, have relatively short lives and require constant maintenance. The green filters used in front of the lamps transmit only about 20% of the light. Green light emitting diodes (LEDs) have been improved recently and are reaching brightness levels making it possible to use them in traffic ...
SBIR Phase II 2001 Department of Transportation -
High Performance Assault Zone Marking System
SBC: ZYBRON OPTICAL ELECTRONICS, INC. Topic: N/ASpecial Operations Forces is looking for assault zone marking systems to facilitate instrument approaches of fixed and rotary wing aircraft under extremely low ceiling/visibility conditions (200' ceiling/0.5 mile visibility). After successfully finishingthe phase-I project, in this phase-II effort, we will concentrate on the whole assault zone marking/lighting system design, calculation/simulation ...
SBIR Phase II 2001 Department of DefenseSpecial Operations Command -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AA CONSTITUTIVE PACKAGE WILL BE DEVELOPED FOR THE MODELING OFDIRECT CONTACT CONDENSATION IN ADVANCED COMPUTER CODES FOR NUCLEAR REACTOR ANALYSIS. SINCE CURENT APPROACHES ARE BUILT UPON FLOW REGIME MAPS WHICH DO NOT ACCOUNT FOR CON DENSATION EFFECTS, PRESENT ADVANCED THERMAL/HYDRAULIC CODES ARE UNABLE TO MODEL COLD LEG FLOW BEHAVIOR CONSISTENTLY DURING CONDENSATION, ESPECIALLY IF THE FLOW IS OSCILLA ...
SBIR Phase II 1986 Nuclear Regulatory Commission