You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Advanced Locomotive Energy Storage System
SBC: Arkansas Power Electronics International, Inc. Topic: 121FR3At present, trains use various dissipative braking systems to slow and stop, and this significant braking energy is ultimately converted to heat and wasted. APEI, Inc. has proposed a hybrid tender which can capture and reuse a significant fraction of this braking energy (at least 50%). The hybrid tender draws power from the rails using a regenerative braking technique rather than by being electr ...
SBIR Phase I 2012 Department of Transportation -
ElectroDynamic Shield for Prevention of Optical Surface Contamination
SBC: Poly Adaptive LLC Topic: 122FR2The Federal Railroad Administration’s (FRA) Automated Track Inspection Program uses optical systems such as cameras or laser-based systems to monitor rail performance throughout the country. These systems are hindered by adverse weather conditions that allow water, dirt and mud to coat their optical components resulting in unwanted maintenance costs. Thus FRA is seeking a low-cost, practical s ...
SBIR Phase I 2012 Department of Transportation -
A Novel Indirectly Cooled Broaching System (ICBS)
SBC: CREARE LLC Topic: A12014Tantalum alloy and silicon nitride gun barrel liners have demonstrated excellent corrosion resistance and wear characteristics for U.S. Army applications. The quality and accuracy of the rifling profile is critical; however, the processes and tooling needed to successfully rifle a gun barrel made from these advanced materials have not been developed due to the difficulty of machining the material ...
SBIR Phase I 2012 Department of DefenseArmy -
Compact, Inexpensive, Microchannel Recuperators for Small Gas Turbines
SBC: CREARE LLC Topic: A12080Small manned and unmanned aircraft need advanced propulsion technology to increase mission capabilities and improve reliability. We propose to develop an innovative recuperator technology that can significantly reduce fuel consumption for small gas turbines. Our microchannel recuperators are built using advanced manufacturing techniques that will enable a compact, inexpensive recuperator to signif ...
SBIR Phase I 2012 Department of DefenseArmy -
High Density Solid Hydrogen Storage for Long-Duration Soldier Power
SBC: CREARE LLC Topic: A10099Providing power for dismounted soldiers on long-duration missions remains a critical technical challenge. Polymer electrolyte membrane (PEM) fuel cells convert hydrogen fuel directly to electric power and offer a lightweight and efficient power source for individual soldiers. However, technology for storing the hydrogen fuel is still too heavy to meet the Armys mission requirements. We propose to ...
SBIR Phase II 2012 Department of DefenseArmy -
Neurological Head Simulator for In-the-Field EEG Recordings
SBC: CREARE LLC Topic: A10066Neuroscience is rapidly expanding beyond its traditional role in the clinic to a practical method of evaluating cognitive performance in the field. The transition of clinical neuroscience tools into operational environments is of particular interest to the military due to the need for soldiers to perform increasingly complex tasks under extremely difficult conditions. Successful transition into op ...
SBIR Phase II 2012 Department of DefenseArmy -
Integrated Portable Power and Cooling System
SBC: ENERGY QUEST TECHNOLOGIES INC Topic: A09090The objective of this project is to build and deliver to the Army two prototype systems that will verify a reduction in fuel consumption by at least 30% and reduce weight by at least 30%, when compared to a currently fielded system. The design presented in this proposal is expected to reduce fuel consumption by over 40% and weight by 58%. These dramatic reductions are attributed to 3 system featur ...
SBIR Phase II 2012 Department of DefenseArmy -
High Temperature Silicon Carbide (SiC) Gate Driver
SBC: Arkansas Power Electronics International, Inc. Topic: A10132APEI, Inc."s Phase II goal is to develop, fabricate and test a compact, high temperature, high performance isolated gate drivers utilizing HTSOI integrated circuits, discrete SiC devices, and high frequency coreless magnetics. Additionally, leveraging its existing high performance high temperature SiC power modules, APEI, Inc. will integrate the developed gate driver into this SiC power module and ...
SBIR Phase II 2012 Department of DefenseArmy -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
MEMS-Based North-Orienting System
SBC: CREARE LLC Topic: A11085The Army uses Unattended Ground Sensors (UGS) for the location and tracking of enemy soldiers and vehicles. The sensors can often determine range and relative bearing to the signal source, but without knowing its own orientation, these data cannot be converted to source geo location and ground track. There is therefore a need for a sensor to determine the UGS azimuth, roll, and pitch relative to a ...
SBIR Phase I 2012 Department of DefenseArmy