You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Diagnostics for the Control Element Drive Mechanism System in Pressurized Water Reactors

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: 21a

    Current designs of Light Water Reactors (LWR) are equipped with control and shutdown rods that are inserted and withdrawn from the reactor core for reactivity control. In particular, the Control Element Drive Mechanism (CEDM) system is widely used for regulating plant power levels and core power distribution in the existing and next generation of Pressurized Water Reactors (PWRs). This system incl ...

    SBIR Phase I 2012 Department of Energy
  2. Characterization and Application of a Novel Neutron Detection Method to Replace Helium-3 in Advanced Neutron Detectors.

    SBC: Ordela, Inc.            Topic: 15a

    Large area neutron detectors with high efficiency, high resolution, high count-rate capability, and fast timing capabilities are required to meet the specific neutron diffraction and imaging needs of the Spallation Neutron Source (SNS) at the Oak Ridge National Laboratory. Due to the current shortage of helium-3, recently developed and existing commercial gas detectors using helium-3 as a neutron ...

    SBIR Phase I 2012 Department of Energy
  3. A NEW TWO-DIMENSIONAL POSITION ENCODER FOR POSITRON EMISSION TOMOGRAPHY (PET)-

    SBC: CTI SERVICES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Energy
  4. DESIGN OF A MOBILE RADIOISOTOPE DELIVERY SYSTEM FOR POSITRON EMISSION TOMOGRAPHY-

    SBC: Orbit, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Energy
  5. A WET TURBOEXPANDER FOR CRYOGENIC HELIUM REFREIGERATORS AND LIQUEFIERS

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Energy
  6. GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  7. A REACTOR CAVITY INSPECTION ROBOT-

    SBC: Remotec Inc.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Energy
  8. EVALUATION OF ROBOTICS FOR FLANGE BOLTING

    SBC: Remotec Inc.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Energy
  9. THIS PROGRAM INVOLVES A MOBILE SEMIAUTONOMOUS ROBOTIC PIPE INSPECTION PLATFORM (ROPIP) FOR HAZARDOUS MAINTENANCE ACTIVITIES.

    SBC: Sees Inc            Topic: N/A

    THIS PROGRAM INVOLVES A MOBILE SEMIAUTONOMOUS ROBOTIC PIPE INSPECTION PLATFORM (ROPIP) FOR HAZARDOUS MAINTENANCE ACTIVITIES. THE DEVICE HAS SENSORY CAPABILITY AND IS MICROPROCESSOR CONTROLLABLE. A UNIQUE TECHNIQUE USING A "SMALL WORLD" APPROACH TO ARTIFICIAL INTELLIGENCE (AI) BY LIMITING THE "REAL WORLD" CONTACT ENVIRONMENT AND PROVIDING A READY ACCESS FOR MOBILITY LOWERS TOE SOFTWARE INPUT AND DE ...

    SBIR Phase I 1985 Department of Energy
US Flag An Official Website of the United States Government