You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Improved Transit Rider Experience

    SBC: Automa Aurora Inc.            Topic: 121FT1

    The project develops a flexible (flex) route bus system, as an alternative to fixed route system plans, to enhance a transit rider’s experience by routing buses in real-time based on rider demand. The architecture leverages existing smart phone, wireless, Internet and GPS technologies but drives innovation through online routing algorithms based on recent theoretical work in optimization and mac ...

    SBIR Phase I 2012 Department of Transportation
  2. Innovative Solutions to Effectively Enforce Anti-texting Rules on Commercial Motor Vehicle (CMV) Drivers

    SBC: Savari Inc.            Topic: 121FM2

    Distracted driving could have severe repercussions leading to loss of life, loss of property, and expensive lawsuits. While there can be many reasons for the driver to get distracted, research shows that the probability of accidents from texting/web-surfing while driving is an order of magnitude higher. Although federal law prohibits texting by operators of commercial vehicles and has strict penal ...

    SBIR Phase I 2012 Department of Transportation
  3. Fast Real Positioning using GNSS

    SBC: SUB CARRIER SYSTEMS CORPORATION            Topic: 121FH2

    This project initially examines the theoretical basis by which low cost “automotive grade” (typically devices with L1 signal tracking only) GPS and GNSS devices can be made to perform with a very rapid start-up and acquisition times and still maintain a high level of sub meter kinematic accuracy when in the presence of various local correctional data such as RTCM. The resources of such a chip ...

    SBIR Phase I 2012 Department of Transportation
  4. SmartWorkZone- Situational awareness messages in the vehicle when driving through a work zone area.

    SBC: Savari Inc.            Topic: 122FH1

    Congestion due to a work zone can cause accidents, as the drivers may not be prepared to take sudden actions ahead of a work zone or in some cases may not have enough visibility/time. Transmitting alert messages in advance can enable the driver to take safety precautionary measures so that it is beneficial to both the driver and the work zone personnel. The proposal aims to develop a scalable sol ...

    SBIR Phase I 2012 Department of Transportation
  5. Creating Spatial Disorientation in Flight Simulation

    SBC: Systems Technology, Inc.            Topic: 122FA1

    Loss of control associated with an inability of pilots to recover from upsets and unusual attitudes is the leading cause of world-wide commercial jet accidents. A key component in many of these events is pilot spatial disorientation. Improved pilot training in these abnormal flight conditions, including the ability of training simulators to replicate spatial disorientation, is needed to reduce l ...

    SBIR Phase I 2012 Department of Transportation
  6. Ka-band Spread Spectrum

    SBC: Alico Systems Inc            Topic: SOCOM12001

    This proposal for a Ka-band Spread Spectrum terminal presents a unique affordable design approach for On-the-move satellite communications. Over the past 5 years Alico Systems has been involved in the design and development of low cost phased array antennas for the DoD. Our most recent product for the Army is based on a 2 dimensional affordable X-band broadband phased array design. For this Ka-ban ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  7. Dual Speed Read Out Integrated Circuit (ROIC)

    SBC: NU-TREK, INC.            Topic: SOCOM12003

    Nu-Trek is proposing a revolutionary two-speed, 30 Hz/960 Hz, digital readout out integrated circuit (DROIC) that simultaneously provides very high resolution images (18-20 bits) at 30 Hz and lower resolution images (10-12 bits) at up to 960 Hz. Power consumption is about 50 mW for a moderate format DROIC. This performance is unprecedented and will enable a widespread implementation of dual speed ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  8. Dual Speed Digital Smart Read Out Integrated Circuit (ROIC)

    SBC: SENSEEKER ENGINEERING            Topic: SOCOM12003

    This readout integrated circuit (ROIC) will provide an all-digital system-on-chip solution for creating dual frame rate hybrid image sensors in combination with a wide variety detector materials. This ROIC will contain intelligent image processing capabilities along with binning, windowing, and digital zoom functions to maximize the number of applications to which it may be applied. Its high dua ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  9. Facial Signature Reduction

    SBC: PACIFIC BLUE INNOVATIONS LLC            Topic: SOCOM12004

    Pacific Blue Innovations proposes to develop a facial signature reduction system which would reduce observable NIR and FIR signatures under varied field conditions.

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  10. Portable Wireless Monitoring Station

    SBC: APPLIED SIGNAL TECHNOLOGY            Topic: N/A

    With the rapid expansion of signaling technology and broad-based adoption and use of commercial communications systems (for example, cellular telephone, satellite telephone, and trunked radio) by enemy military, paramilitary, and terrorist groups, a newset of tactical situational awareness and force protection challenges must be addressed and met by deployed SOF signal surveillance teams. Applied ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government