You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  2. Parallel Operation of Compact, Efficient Turbogenerators for Robust Tactical Energy Independence

    SBC: Integrated Solutions for Systems, Inc.            Topic: OSD10EP1

    The need for clean, reliable electrical power is increasing in both the military and commercial sectors, which places high priority on technologies that provide flexibility and increased energy independence. The potential for reduced maintenance, high reliability, and increased durability is currently being demonstrated with microturbine generator (MTG) hardware. Currently these MTGs have been lar ...

    SBIR Phase II 2012 Department of DefenseOffice of the Secretary of Defense
  3. Field Programmable Gate Array (FPGA) Physical Unclonable Functions

    SBC: Lewis Innovative Technologies, Inc.            Topic: OSD10A02

    LIT accomplished all Phase I goals and technical objectives. In Phase I LIT produced an effective Random Number Generator (RNG) and tested two PUF designs. The PUF designs showed greatly improved Entropy and Stability over other technologies. LITs Entropy Goal for Phase II is 100% (already proven by analysis) and the Stability goal is one bit error per million bits. In Phase II LIT will ma ...

    SBIR Phase II 2012 Department of DefenseOffice of the Secretary of Defense
  4. Dynamic Non-Contact 3D Measurement System for Rollover Testing

    SBC: PHOTON-X, INC.            Topic: 07NH2

    During Phases I and II, Photon-X successfully demonstrated the feasibility of applying its patented Spatial Phase Imaging technology to the problem of non-contact 3D imaging during a rollover test and delivered a viable prototype system. During Phase IIB, Photon-X will continue to refine the system in preparation for commercialization. Photon-X will use this opportunity to add an additional camer ...

    SBIR Phase II 2012 Department of Transportation
  5. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
  6. GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government