You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Smart Pipeline Network- Cased Pipe for Monitoring and Sensor System

    SBC: Odyssian Technology, L.L.C.            Topic: 121PH3

    This PHMSA SBIR focuses on the development of a new multi-channel cased in pipe design with internal support structure that will allow access along its entire axial length while adequately securing the carrier pipe to the containment pipe. When combined with the Seal Sensor System (proposed separately), this technology will allow a Smart Pipeline Network having integrated sensor networks that pro ...

    SBIR Phase I 2012 Department of Transportation
  2. Smart Pipeline Network- Pipe & Repair Sensor System

    SBC: Odyssian Technology, L.L.C.            Topic: 121PH2

    This PHMSA SBIR focuses on the development of a Pipe and Repair Sensor System. When combined with the Seal Sensor System (proposed separately), this technology will allow for a Smart Pipeline Network having integrated sensor networks that provide for continuous real-time monitoring of leaks and system health. In this program, smart pipes and smart composites repair having integrated leak detecti ...

    SBIR Phase I 2012 Department of Transportation
  3. Smart Pipeline Network- Seal Sensor System

    SBC: Odyssian Technology, L.L.C.            Topic: 121PH1

    This PHMSA SBIR focuses on the development of a Seal Sensor System. When combined with the Pipe and Repair Sensor System (proposed separately), this technology will allow for a Smart Pipeline Network having integrated sensor networks that provide for continuous real-time monitoring of leaks and system health. In this program, sensor-seals having both sealing and force sensing functionality, as w ...

    SBIR Phase I 2012 Department of Transportation
  4. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  5. RESEARCH TO INVESTIGATE THE POTENTIALS OF ABRASION JET IN TRANSPORT SYSTEMS CONSTRUCTION

    SBC: Fluidyne Corp            Topic: N/A

    HIGH-PRESSURE WATERJET IS ONE OF SEVERAL NEW METHODS FOR CUTTING MATERIALS DEVELOPED DURING THE LAST DECADE. CURRENTLY IT IS USED, AT STATIC WATER PRESSURE UP TO 60,000 PSI, TO CUT A WIDE VARIETY OF SOFT AND MEDIUM-HARD MATERIALS IN FACTORIES; IT HAS BEEN EVALUATED FOR GEOTECHNICAL APPLICATIONS WITH VERY LIMITED SUCCESS. THIS RESEARCH CONCERNS THE USE OF ABRASIVE-ENTRAINED WATERJET FOR CUTTING AND ...

    SBIR Phase II 1985 Department of Transportation
  6. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
  7. TIME DOMAIN REFLECTOMETRY LIQUID LEVEL DETECTION DATA EVALUATION AND CONCEPT ASSESSMENT

    SBC: Mohr And Associates            Topic: N/A

    THIS PROGRAM DEALS WITH THE EVALUATION OF LIQUID LEVEL DETECTION DATA OBTAINED DURING THE MT-4 EXPERIMENT, WHICH IS THE LAST TEST PERFORMED IN THE LOCA SIMULATION IN NRU REACTOR PROGRAM. THESE DATA OFFER THE POTENTIAL OR RELATINGTHE ONLY FULL-LENGTH IN REACTOR REFLOOD INFORMATION ON N NUCLEAR-POWERED PWR FUEL BUNDLES TO COLLAPSED LIQUID LEVEL AND TWO-PHASE COOLING OF DEFORMED AND RUPTURED FUEL BUN ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
  8. BUNDLES UNDER LOW REFLOOD RATES AND BOIL OFF CONDITIONS

    SBC: Mohr And Associates            Topic: N/A

    THIS PROGRAM DEALS WITH USING THE DIGITIZED VIDEO TDR LIQUIDLEVEL DATA PREPARED UNDER CONTRACT (NRC-04-84-146) OF THE MEMT-4 TEST FROM THE LOCA SIMULATION IN NRU PROGRAM. THESE NEW DATA AND TECHNIQUES WILL BE APPLIED TO ESTIMATE THE VOIDFRACTION, LIQUID LEVEL, AND LOCAL HEAT TRANFER CONDITIONS FOR THE OTHER NRU TESTS WHERE ONLY SELF POWERED NEUTRON DETECTORS (SPND'S) AND THERMOCOUPLE DATA ARE AVAI ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  9. GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government