You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Electronically Controlled Pneumatic Brake System Emulator Development

    SBC: Sharma & Associates, Inc.            Topic: 121FR2

    Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. This project will investigate the feasibility of devices that can help to ease this transition by allowing ECP equipped cars to operate in a conventionally braked train, as well as devices to permit con ...

    SBIR Phase I 2012 Department of Transportation
  2. Unipolar nBn HgCdTe on Silicon for High Performance, Low Cost NIR/SWIR Imagers

    SBC: EPIR TECHNOLOGIES INC            Topic: SOCOM12002

    We propose the development of a near infrared/shortwave infrared (NIR/SWIR) sensor based on mercury cadmium telluride (HgCdTe) in an n-type/barrier/n-type (nBn) architecture, designed for room-temperature operation in the 0.7 to 2.8µm NIR/SWIR spectral range. The sensor will compete as a low cost/high performance alternative to near infrared indium gallium arsenide (InGaAs)-based cameras by prov ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  3. Dual Speed Read Out Integrated Circuit (ROIC)

    SBC: RNET TECHNOLOGIES INC            Topic: SOCOM12003

    This SBIR requires the development of an innovative dual speed ROIC (DSROIC) architecture, mated to a detector array within the band of interest and with suitable response speed. According to the solicitation, this effort will establish a DSROIC concept capable of performing conventional staring imaging at video frame rates, while simultaneously being able to process and detect each frame at a hi ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  4. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  5. FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE

    SBC: Coin Systems Inc            Topic: N/A

    FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE MIS-HANDLING, EMPLOYEE FRAUD, EMPLOYEE THEFT. THIS STUDY WILL FOCUS ON THE FEASIBILITY OF IMPLEMENTING T THE ELECTRONIC/MICRO PROCESSOR BASED COLLECTION ...

    SBIR Phase I 1985 Department of Transportation
  6. OF LONGITUDINAL STRESSES IN RAILS UNDER OPERATING CONDITIONS

    SBC: Eggers And Associates            Topic: N/A

    A NOVEL TECHNIQUE (PATENT IN APPLICATION) IS PROPOSED FOR THE NON-DESTRUCTIVE MEASUREMENT OF LONGITUDINAL STRESSES IN RAIL WHICH MAKE USE OF TWO PHENOMENA KNOWN AS (1) MAGNE TOSTRICTION AND (2) SKIN EFFECT. MAGNETOSTRICTION IS EXHIBITED BY FERROMAGNETIC MATERIALS SUCH AS RAIL STEELS AND GIVES RISE TO A CHANGE IN THE MAGNETIC PERMEABILITY WITH APPLIED STRESS. THE SKIN EFFECT DETERMINES THE DISTRIBU ...

    SBIR Phase I 1985 Department of Transportation
  7. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
  8. GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  9. A NEW TECHNOLOGY CALLED "CHEMICAL PARAMETER SPECTROMETRY" IS MODIFIED TO BE ABLE TO ANALYZE SOLID, LIQUID, AND GASEOUSSAMPLES.

    SBC: Transducer Research Inc.            Topic: N/A

    A NEW TECHNOLOGY CALLED "CHEMICAL PARAMETER SPECTROMETRY" IS MODIFIED TO BE ABLE TO ANALYZE SOLID, LIQUID, AND GASEOUSSAMPLES. THE EXPERIMENTS PERFORMED IN THIS WORK RESULT IN THE DESIGN FOR A PROTABLE INSTRUMENT (BLACK BOX) THAT CAN IDENTIFY VIRTUALLY ALL HAZARDOUS COMMODITIES. THE HAZARD OUS SPILLS IDENTIFICATION SYSTEM IS PORTABLE, FULLY A YAUTOMATED, AND RUGGED. IT WILL IDENTIFY HAZARDOUS SUBS ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government