You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Real Time Signal State Transition Software for ATC- NTCIP Interface
SBC: Advanced Technologies, Inc Topic: 06FH1Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...
SBIR Phase II 2012 Department of Transportation -
Intelligent Dimension Evaluation and Alerting System (IDEAS)
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 111FH3Low or narrow bridges are often hit by legal-sized commercial vehicles and oversize vehicles often strike regulation bridges. In both cases the accidents result in extensive property damage, possible personal injuries and even death, and increased traffic congestion. Past attempts to warn drivers of risks for bridge hits have failed due to inaccurate measurement, high rates of false alarms, or s ...
SBIR Phase II 2012 Department of Transportation -
Transportation Autonomous Device
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 101FR4Job related injuries cost the railroads over $1 billion annually and from 2005 through 2008 30.3% of those injuries occurred in the rail yard. A majority of the accidents were attributed to slips, trips and falls from the worker slipping on ballast or tripping on other trackside objects. IEM is developing a Transportation Autonomous Device that may be configured to work autonomously, with a remote ...
SBIR Phase II 2012 Department of Transportation -
Enhanced Small Arms Ammunition
SBC: LIBERTY AMMUNITION, INC. Topic: SOCOM06008Historically, small arms ammunition has been limited in it's performance due to dated projectile designs. Recently, Liberty Ammunition has introduced a novel patented projectile design, which optimizies accuracy, range, hard and soft target perfomance in a single round. This innovation increases the capability of existing small arms and eliminates the need for users to carry more than one typ ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Advanced Longevity System for the Environmental Protection of Electrochromic Materials
SBC: ECLIPSE ENERGY SYSTEMS, INC. Topic: AF06019Eclipse has a variable transmittance coating to meet the requirement for a single day/night visor for aircrews. The Eclipse Electrochromic Device (EclipseECD) is well suited for light modulation applications. The EclipseECD modulates transmitted light intensity over a broad range (80% to 20% transmission) by changing optical density under an applied electric field (1.5V). This process is reversed ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
HYDROGEN GENERATION AND BLANKETING ASSESSMENT FOR SEVERE ACCIDENTS
SBC: ENGINEERING SCIENCE ANALYSIS CORP Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
A PROOF-OF-CONCEPT PROJECT SHOWING FEASIBILITY OF A SEMIAUTOMATIC SYSTEM INTEGRATING ILS, MLS AND EN ROUTE NAVIGATION FOR LIGHT AIRCRAFT IS PROPOSED.
SBC: Genovese Associates Topic: N/AA PROOF-OF-CONCEPT PROJECT SHOWING FEASIBILITY OF A SEMIAUTOMATIC SYSTEM INTEGRATING ILS, MLS AND EN ROUTE NAVIGATION FOR LIGHT AIRCRAFT IS PROPOSED. THE PURPOSE OF THE SYSTEM IS TO INCREASE NAVIGATION PRESISION AND S D SIMPLICITY, ESPECIALLY IN THE RNAV AND MLS ENVIRONMENTS. THESYSTEM WOULD ALSO ENHANCE AIR TRAFFIC CONTROL CAPACITY, REDUCE PILOT WORKLOAD, AND IMPROVE SAFETY MARGINS. INFORMATION W ...
SBIR Phase I 1985 Department of Transportation -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT
SBC: Ybarrondo & Associates Topic: N/ATHE NUCLEAR REGULATORY COMMISSION (NRC) HAS SPONSORED THE DEVELOPMENT OF THE NUCLEAR PLANT DATA BANK (NPDB) SYSTEM AT TECHNOLOGY DEVELOPMENT OF CALIFORNIA (TDC) FOR APPROXIMATELY THE LAST FIVE YEARS. THIS WORK IS ESSENTIALLYCOMPLETE AND IS AN INTEGRAL PART OF THE NUCLEAR PLANT A (NPA). TO MAKE THE NPDB A USEFUL AND PRODUCTIVE SYSTEM, REPRESENTATIVE DESCRIPTIONS OF NUCLEAR POWER PLANTS MUST BE ENTE ...
SBIR Phase II 1985 Nuclear Regulatory Commission