You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Real Time Signal State Transition Software for ATC- NTCIP Interface
SBC: Advanced Technologies, Inc Topic: 06FH1Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...
SBIR Phase II 2012 Department of Transportation -
Enhanced Small Arms Ammunition
SBC: LIBERTY AMMUNITION, INC. Topic: SOCOM06008Historically, small arms ammunition has been limited in it's performance due to dated projectile designs. Recently, Liberty Ammunition has introduced a novel patented projectile design, which optimizies accuracy, range, hard and soft target perfomance in a single round. This innovation increases the capability of existing small arms and eliminates the need for users to carry more than one typ ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Advanced Longevity System for the Environmental Protection of Electrochromic Materials
SBC: ECLIPSE ENERGY SYSTEMS, INC. Topic: AF06019Eclipse has a variable transmittance coating to meet the requirement for a single day/night visor for aircrews. The Eclipse Electrochromic Device (EclipseECD) is well suited for light modulation applications. The EclipseECD modulates transmitted light intensity over a broad range (80% to 20% transmission) by changing optical density under an applied electric field (1.5V). This process is reversed ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Signal State Transition Software Development
SBC: Advanced Technologies, Inc Topic: 06FH1ATI's Phase II effort will consist of developing an open source Signal Control Program Environment (SCOPE). This SCOPE will incorporate either an open source traffic signal control program or a more refined version of the signal control logic ATI developed in our Phase I effort. ATI will develop SCOPE so that the Cooperative Intersection Collision Avoidance System (CICAS) and Adaptive Control Sys ...
SBIR Phase II 2011 Department of Transportation -
Demonstration of a Low-Cost Vehicle Monitoring System for Tractor Trailers
SBC: MAINSTREAM ENGINEERING CORP Topic: 112FM1Mainstream has been developing a unique wireless Vehicle Monitoring System (VMS). As discussed in this proposal, prior internally funded efforts have already demonstrated key elements of this decentralized, low-cost, and easy-to-install system. This proposal also contains the results of extensive market research to verify the market demand and identify desirable features. Mainstream's previous ...
SBIR Phase I 2011 Department of Transportation -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001Solid State Scientific Corporation (SSSC) is pleased to propose the design of a single-board, integrated Hostile Fire Indication (HFI) system with the nominal size, weight, and power constraints for operation as an adjunct sensor within the AN/AVR-2B(V) Laser Warning Set. Work on Phase I will consist of the preliminary design of a single circuit board that includes an uncooled, Commercial Off-The ...
SBIR Phase I 2011 Department of DefenseSpecial Operations Command -
Integrated Diver Monitoring System
SBC: CREARE LLC Topic: SOCOM11002Special Warfare Combat Swimmers operate in a hostile environment characterized by excessive physiologic demands and complete reliance on their equipment. Diver safety and situational awareness can be greatly improved by an integrated system capable of monitoring both diver physiologic status and breathing apparatus operation. During the course of this project Creare will develop an Integrated Di ...
SBIR Phase I 2011 Department of DefenseSpecial Operations Command -
Ultra-Compact Power System for Small Unmanned Aerial Systems
SBC: CREARE LLC Topic: SOCOM11003Air-launched, small unmanned aerial systems (SUAS) offer the potential for a tremendous increase in airborne sensing and ground support capability. However, breakthrough power technology is needed to enable these systems to reach their potential. We propose to develop a power system designed to meet the extremely challenging performance, operational, and environmental requirements for service on ...
SBIR Phase I 2011 Department of DefenseSpecial Operations Command -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission