You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Clean, Green, ChemBio Defense/Fire Retardant Process Using Nanotechnology

    SBC: Aqua Resources Corporation            Topic: SOCOM10007

    NanoPlatelets (NPs) created of metal hydroxides present entirely new and previously unknown set of morphologes/properties and are a virtually new frontier and unstudied field of Material Science and may be leveraged into many of todays DoD and Comercial Technical Challenges and applications. Case in point is SOCOM's Defense Mitigation and Decontamination of military aircraft and equipment and ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  2. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  3. ON-LINE PLANT ANALYZER UTILIZATION IN CONTROL ROOM FOR SURVEILLANCE OF PLANT SAFETY

    SBC: Dynatrek Inc.            Topic: N/A

    THE PRINCIPAL SCOPE OF THE PROPOSED RESEARCH IS TO DEVELOP SOFTWARE FOR A BC-CONTROLLER WHOSE PURPOSE IS TO SUPPLY AND CONSTANTLY UPDATE THE BOUNDARY CONDITIONS (BC) TO AN ON-LINE PLANT ANALYZER, ENABLING IT TO FAITHFULLY TRACK A NUMBER OF THE CONTINUOUSLY MEASURED PLANT PARAMETERS. THE BC-CONTROLLER SAMPLES PLANT MEASUREMENTS FROM THE PLANT COMPUTER MEMORY. THE PLANT ANALYZER, IN TURN, PROVIDES D ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government