You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Real Time Signal State Transition Software for ATC- NTCIP Interface
SBC: Advanced Technologies, Inc Topic: 06FH1Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...
SBIR Phase II 2012 Department of Transportation -
Enhanced Small Arms Ammunition
SBC: LIBERTY AMMUNITION, INC. Topic: SOCOM06008Historically, small arms ammunition has been limited in it's performance due to dated projectile designs. Recently, Liberty Ammunition has introduced a novel patented projectile design, which optimizies accuracy, range, hard and soft target perfomance in a single round. This innovation increases the capability of existing small arms and eliminates the need for users to carry more than one typ ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Clean, Green, ChemBio Defense/Fire Retardant Process Using Nanotechnology
SBC: Aqua Resources Corporation Topic: SOCOM10007NanoPlatelets (NPs) created of metal hydroxides present entirely new and previously unknown set of morphologes/properties and are a virtually new frontier and unstudied field of Material Science and may be leveraged into many of todays DoD and Comercial Technical Challenges and applications. Case in point is SOCOM's Defense Mitigation and Decontamination of military aircraft and equipment and ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Advanced Longevity System for the Environmental Protection of Electrochromic Materials
SBC: ECLIPSE ENERGY SYSTEMS, INC. Topic: AF06019Eclipse has a variable transmittance coating to meet the requirement for a single day/night visor for aircrews. The Eclipse Electrochromic Device (EclipseECD) is well suited for light modulation applications. The EclipseECD modulates transmitted light intensity over a broad range (80% to 20% transmission) by changing optical density under an applied electric field (1.5V). This process is reversed ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Seat/Bolster/Other
SBC: ACTIVE SHOCK, INC. Topic: N/AA shock mitigating suspended seat, which places the Special Forces Operator in an optimal ergonomic position, will be developed for use in the NSW 11M RIB. It will feature a semi-actively controlled shock absorber to optimize the suspension for a broadrange of operator weights and sea states. In the Phase I effort, a conceptual design and architecture for both control hardware and software was d ...
SBIR Phase II 2003 Department of DefenseSpecial Operations Command -
Multi-Spectral Low-Light Imaging
SBC: CANVS CORP. Topic: N/ABased on the extensive theoretical and experimental studies carried out in support of the CANVS/SOCOM Phase-I contract, CANVS has determined what hardware it will deliver under the Phase-II effort. The proposed system configurations were arrived at througha series of decisions taking into account form, fit, function, and the ability for rapid transition into production.
SBIR Phase II 2003 Department of DefenseSpecial Operations Command -
Development of Frequency Hopper/DSSS Detection Algorithms
SBC: Herrick Technology Laboratories Inc. Topic: N/AThe development of a hardware module for installation in DRT Receiver hardware to allow for the real-time detection and identification of FH and DSSS spread spectrum signals using the FDDM algorithm developed under Phase I.
SBIR Phase II 2003 Department of DefenseSpecial Operations Command -
Development of Innovative Corridor Assessment and Land Acquisition Management
SBC: HSA Consulting, Inc Topic: N/ADetermination of new roadway alignments together with the acquisition of right of way needed to support these alignments is a complex multidisciplinary process. This process is further complicated when these decisions require consideration of potential for natural and environmental hazards. Analytical tools are needed to consider alternatives and to make meaningful cost benefit trades. These to ...
SBIR Phase I 2003 Department of Transportation -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission