You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Reducing Impact of Severe Space Weather on Global Positioning System (GPS) Satellite Users
SBC: PROPAGATION RESEARCH ASSOCIATES, INC Topic: 844WIn Phase II, Propagation Research Associates, Inc., (PRA) proposes to complete the development of a real-time nowcast of ionospheric scintillation impacts on GPS users. Continuing its partnership with NASA’s Jet Propulsion Laboratory, PRA will implement real-time production of a map of ionospheric scintillation parameters over the United States using real-time data streamed from the National Geo ...
SBIR Phase II 2013 Department of CommerceNational Oceanic and Atmospheric Administration -
Clean, Green, ChemBio Defense/Fire Retardant Process Using Nanotechnology
SBC: Aqua Resources Corporation Topic: SOCOM10007NanoPlatelets (NPs) created of metal hydroxides present entirely new and previously unknown set of morphologes/properties and are a virtually new frontier and unstudied field of Material Science and may be leveraged into many of todays DoD and Comercial Technical Challenges and applications. Case in point is SOCOM's Defense Mitigation and Decontamination of military aircraft and equipment and ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
LONGITUDINAL STRESS (FORCE) MEASUREMENT OF RAIL UNDER OPERATING CONDITIONS
SBC: Magnasonics Inc Topic: N/AN/A
SBIR Phase I 1985 Department of Transportation -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission