You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Non-Destructive Test Method for Rapid Determination of the Chemical Composition of Concrete in Field
SBC: METNA CO Topic: 122FH2While thorough assessment of concrete chemistry is vital to evaluating the health of (transportation) infrastructure systems, the costly and time-consuming nature of available chemical analysis methods limit their applications. A nondestructive test method will be developed for thorough evaluation of concrete chemistry and deterioration conditions at different depths. An analytical chemistry metho ...
SBIR Phase I 2012 Department of Transportation -
Ka-band Spread Spectrum
SBC: EMAG TECHNOLOGIES, INC. Topic: SOCOM12001EMAG Technologies, Inc. (Ann Arbor, MI) is responding to a US Special Operations Command solicitation for a Wideband Global SATCOM (WGS) certified Ka-Band antenna. The solicitation requests the development and integration of a WGS-certified, low-visibility, small-form-factor commercial and military capable Ka-band spread spectrum antenna (KSSA) including the software for the modem to support Ka Sp ...
SBIR Phase I 2012 Department of DefenseSpecial Operations Command -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Solar Roadways
SBC: SOLAR ROADWAYS INCORPORATED Topic: 091FH5Solar Roadways Incorporated envisions replacing current asphalt surfaces with modular Solar Road Panels: structurally-engineered solar panels that can be driven upon. The roadway will generate electricity, become our nation's power grid, make all-electric vehicles practical, and transport rainwater to desired locations. Collecting solar energy for just four hours/day would produce three times m ...
SBIR Phase I 2009 Department of Transportation -
RECENT BREAK THROUGHS IN THE DEVELOPMENT OF (LOW COST LIGHT-WEIGHT) HONECOMB ENERGY ABSORBERS FOR AUTOMOTIVE BUMPER SYSTEMS NOW MAKE IT POSSIBLE TO DESIGN A COST-EFFECTIVE LOW PEAK FORCE BUMPER SYSTEM WHICH CAN BE DESIGNED TO TRANSMIT AN EXTREMELY LOW
SBC: Concept Analysis Corp Topic: N/ARECENT BREAK THROUGHS IN THE DEVELOPMENT OF (LOW COST LIGHT -WEIGHT) HONECOMB ENERGY ABSORBERS FOR AUTOMOTIVE BUMPER SYSTEMS NOW MAKE IT POSSIBLE TO DESIGN A COST-EFFECTIVE LOW PEAK FORCE BUMPER SYSTEM WHICH CAN BE DESIGNED TO TRANSMIT AN EXTREMELY LOW SHOCK LEVEL TO VEHICLE OCCUPANTS. ONE OF CAC'S CONCEPTS IS TO DESIGN A BUMPER SYSTEM CONPOSED OF A FRONT FACE MOUNTED (EVA) HONEYCOMB ABSORBER COVE ...
SBIR Phase I 1985 Department of Transportation -
HYDROGEN GENERATION AND BLANKETING ASSESSMENT FOR SEVERE ACCIDENTS
SBC: ENGINEERING SCIENCE ANALYSIS CORP Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT
SBC: Ybarrondo & Associates Topic: N/ATHE NUCLEAR REGULATORY COMMISSION (NRC) HAS SPONSORED THE DEVELOPMENT OF THE NUCLEAR PLANT DATA BANK (NPDB) SYSTEM AT TECHNOLOGY DEVELOPMENT OF CALIFORNIA (TDC) FOR APPROXIMATELY THE LAST FIVE YEARS. THIS WORK IS ESSENTIALLYCOMPLETE AND IS AN INTEGRAL PART OF THE NUCLEAR PLANT A (NPA). TO MAKE THE NPDB A USEFUL AND PRODUCTIVE SYSTEM, REPRESENTATIVE DESCRIPTIONS OF NUCLEAR POWER PLANTS MUST BE ENTE ...
SBIR Phase II 1985 Nuclear Regulatory Commission