You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Environmentally Friendly Low Friction Coating for Concrete Barriers
SBC: RESODYN CORPORATION Topic: 121FH1Resodyn Corporation is proposing a material and application system that will create a low friction coating on concrete median barriers. The advanced material developed for the low friction coating is an affordable, tough, weather resistant, and environmentally friendly copolymer. The proposed application concept is for truck mounted equipment that enables a single pass application of the coating ...
SBIR Phase I 2012 Department of Transportation -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
A Low-Cost IR-Enhanced Video System for Early Obstacle Warning
SBC: CREARE LLC Topic: N/AMore than 6,000,000 auto accidents occur in the U.S. each year, with about one third resulting in injury and 40,000 resulting in fatality. Approximately thirteen percent of these crashes involve pedestrians. A much broader group of generalized roadway obstacles including pedestrians, other automobiles and non-fixed objects, is responsible for over ninety percent of the accidents. A reasonably p ...
SBIR Phase I 2001 Department of Transportation -
HYDROGEN GENERATION AND BLANKETING ASSESSMENT FOR SEVERE ACCIDENTS
SBC: ENGINEERING SCIENCE ANALYSIS CORP Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT
SBC: Ybarrondo & Associates Topic: N/ATHE NUCLEAR REGULATORY COMMISSION (NRC) HAS SPONSORED THE DEVELOPMENT OF THE NUCLEAR PLANT DATA BANK (NPDB) SYSTEM AT TECHNOLOGY DEVELOPMENT OF CALIFORNIA (TDC) FOR APPROXIMATELY THE LAST FIVE YEARS. THIS WORK IS ESSENTIALLYCOMPLETE AND IS AN INTEGRAL PART OF THE NUCLEAR PLANT A (NPA). TO MAKE THE NPDB A USEFUL AND PRODUCTIVE SYSTEM, REPRESENTATIVE DESCRIPTIONS OF NUCLEAR POWER PLANTS MUST BE ENTE ...
SBIR Phase II 1985 Nuclear Regulatory Commission