Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  2. HYDROGEN GENERATION AND BLANKETING ASSESSMENT FOR SEVERE ACCIDENTS

    SBC: ENGINEERING SCIENCE ANALYSIS CORP            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  3. GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  4. NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT

    SBC: Ybarrondo & Associates            Topic: N/A

    THE NUCLEAR REGULATORY COMMISSION (NRC) HAS SPONSORED THE DEVELOPMENT OF THE NUCLEAR PLANT DATA BANK (NPDB) SYSTEM AT TECHNOLOGY DEVELOPMENT OF CALIFORNIA (TDC) FOR APPROXIMATELY THE LAST FIVE YEARS. THIS WORK IS ESSENTIALLYCOMPLETE AND IS AN INTEGRAL PART OF THE NUCLEAR PLANT A (NPA). TO MAKE THE NPDB A USEFUL AND PRODUCTIVE SYSTEM, REPRESENTATIVE DESCRIPTIONS OF NUCLEAR POWER PLANTS MUST BE ENTE ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
  5. LONGITUDINAL STRESS (FORCE) MEASUREMENT OF RAIL UNDER OPERATING CONDITIONS

    SBC: Magnasonics Inc            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government