You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Improved Transit Rider Experience
SBC: MERCURY DATA SYSTEMS, INC. Topic: 121FT1We propose to develop an advanced navigation solution for public transportation passengers that will guide them from their origin to single or multiple destination points and across multiple modes of transportation. Passengers will simply need to enter their destination (and optionally a starting point) and the system will select optimal and alternative routes. The navigation software will run on ...
SBIR Phase I 2012 Department of Transportation -
Rod Control System On-Line Condition Monitoring and Advanced Diagnostics for Existing and Next Generation Nuclear Power Plants
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: 58aAging and obsolescence issues have recently led to problems with the rod control systems of existing pressurized water reactors. These issues, along with plans for plant life extension, have prompted the industry to actively seek viable options to monitor the health of these systems in order to ensure reliable plant operation for decades to come. This proposed work offers a comprehensive research ...
SBIR Phase II 2012 Department of Energy -
Advanced Diagnostics for the Control Element Drive Mechanism System in Pressurized Water Reactors
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: 21aCurrent designs of Light Water Reactors (LWR) are equipped with control and shutdown rods that are inserted and withdrawn from the reactor core for reactivity control. In particular, the Control Element Drive Mechanism (CEDM) system is widely used for regulating plant power levels and core power distribution in the existing and next generation of Pressurized Water Reactors (PWRs). This system incl ...
SBIR Phase I 2012 Department of Energy -
Power Efficient Supercomputing
SBC: Cognitive Electronics Llc Topic: 35dDatacenters house server farms that perform many different jobs ranging from search engines to supercomputing. In aggregate these computer systems already consume enormous power, and their energy requirements are increasing both in absolute terms and in proportion to the total capacity of the United States electrical grid. With higher power consumption has come greater difficulty in keeping these ...
SBIR Phase II 2012 Department of Energy -
Dynamically Controlled Electric Demand Management System
SBC: Enhanced Systems Consulting, Inc. Topic: 35aThe variation between peak and off-peak electricity demand fluctuates up to 70 percent over the course of a 24 hour cycle. This degree of variability is a driver for costly inefficiencies within the power gridto prevent blackouts and meet customer demandas well as power sell offs to consume excess generation available during off-peak hours. Projections estimate the power demand to double by 2050 r ...
SBIR Phase II 2012 Department of Energy -
Characterization and Application of a Novel Neutron Detection Method to Replace Helium-3 in Advanced Neutron Detectors.
SBC: Ordela, Inc. Topic: 15aLarge area neutron detectors with high efficiency, high resolution, high count-rate capability, and fast timing capabilities are required to meet the specific neutron diffraction and imaging needs of the Spallation Neutron Source (SNS) at the Oak Ridge National Laboratory. Due to the current shortage of helium-3, recently developed and existing commercial gas detectors using helium-3 as a neutron ...
SBIR Phase I 2012 Department of Energy -
Thin-Window P-Type Point-Contact Germanium Detectors for Rare Particle Detection 45c
SBC: Phds Co. Topic: 45cDOE Nuclear Physics low-background rare-particle detection arrays require germanium detectors having the minimum possible background and maximum sensitivity. Larger p-type point-contact germanium detectors having better performance are being experimentally developed through collaboration with DOE low-background researchers. Semiconductor-detector fabrication improvements and electronic-discrimina ...
SBIR Phase II 2012 Department of Energy -
Polarized 3He Circulating Technologies for Neutron Analyzers
SBC: XEMED LLC Topic: 18bThe United States and several other countries are investing in new neutron scattering facilities as well as upgrading existing ones due to their promise for fundamental and applied research that can catalyze advances in energy, telecommunications, manufacturing, plastics, transportation, biotechnology, and health. The performance of one new type of instrument, the wide-angle polarized neutron spec ...
SBIR Phase II 2012 Department of Energy -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
COMPOSITE SHIELDS FOR SPACE POWER SYSTEMS-
SBC: Applied Research Associates, Inc. Topic: N/ARECENTLY CONCEIVED RADIATION TRANSPORT ANALYSIS TECHNIQUES WILL BE STUDIED TO ASSESS THEIR USE IN SPACE NUCLEAR POWER SHIELD DESIGN OPTIMIZATION. THE ULTIMATE AIM IS TO DETERMINE OPTIMAL COMPOSITIONS AND CONFIGURATIONS OF SHIELD COMPONENTS FOR THE PRO- TECTION OF SPACE SYSTEMS AGAINST MIXED RADIATION FIELDS FROM INTERNAL AND EXTERNAL SOURCES. PARTICULAR ATTENTION WILL BE PAID TO USING COMPOSITE AN ...
SBIR Phase I 1985 Department of Energy