You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Improved Transit Rider Experience

    SBC: MERCURY DATA SYSTEMS, INC.            Topic: 121FT1

    We propose to develop an advanced navigation solution for public transportation passengers that will guide them from their origin to single or multiple destination points and across multiple modes of transportation. Passengers will simply need to enter their destination (and optionally a starting point) and the system will select optimal and alternative routes. The navigation software will run on ...

    SBIR Phase I 2012 Department of Transportation
  2. Short-Wave-Infrared (SWIR) Night Glow Photon-Counting Integrated Circuit (PCIC) Focal Plane Array (FPA) Detectors and Night Vision Cameras

    SBC: Wavefront            Topic: SOCOM12002

    Almost all intelligence, surveillance, and reconnaissance (ISR) platforms and all small agile munitions need high-sensitivity night vision imagers for situational awareness and for target identification, tracking and discrimination. The requirements of situational awareness, responsiveness and weapon precision are ever more stringent in current and future urban warfare, where minimum collateral da ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  3. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  4. Fast Curing Modular Composite Patch System for Field Applications

    SBC: CONTINUUM DYNAMICS INC            Topic: SOCOM07002

    SOCOM requires a method to field repair multiple materials as well as to mount armor and related hardware for a variety of tactical purposes with a composite material. To address this need, we propose application of a “Modular UV Patch” (MUVP) system that incorporates ultraviolet curing resin systems and an innovative technique for delivering the UV light through optically lossy fibers that f ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  5. Enhanced Small Arms Ammunition

    SBC: CORVID TECHNOLOGIES, LLC            Topic: SOCOM06008

    A number of different special purpose assault rifle rounds are currently required to meet the operational needs of USSOCOM forces. Development of new rounds that provide both enhanced penetration and lethality is necessary to increase the overall effectiveness of USSOCOM forces, and reduce the need for special purpose ammunition. These enhancements must be obtained with sacrificing bullet accura ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  6. Abrasion protection, ballistic tolerance, and laser protection for windows/sensor on rotary wing aircraft.

    SBC: EXOTHERMICS, INC.            Topic: SOCOM07007

    In light of the potential threat and related environmental durability requirements set forth in SOCOM SBIR solicitation #07-007, Exothermics and their Phase 1 program team propose the development and initial testing of a new family of ballistically-efficient, multi-threat, optically-transparent armor laminates for use in applications such as windscreens and sensor windows on special operations hel ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  7. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The proposed buried innerduct/duct network (BIN) comprises an integrated system to facilitate future upgrades of buried communications (telephony, CATV) and power lines. The objective of the project is to provide improved, cost-effective hardware and practices relative to present buried construction procedures, which do not otherwise allow for future upgrades or replacement of initially installed ...

    SBIR Phase II 2007 Department of Transportation
  8. Multi-Purpose, Field Expedient Engineering Composite Material

    SBC: TRIANGLE POLYMER TECHNOLOGIES, INC.            Topic: SOCOM07002

    There is an ongoing requirement for lightweight, strong armor material, long lasting field expedient repair capabilities, and covert attaching of insulated devices to land and water-based targets without inhibiting RF signals. The objective of this proposal is to utilize the epoxy/urethane/acrylate hybrid resin systems that have been commercialized by Triangle Polymer Technologies to develop a str ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  9. COMPUTER TECHNOLOGY TO EVALUATE AIRCRAFT VORTEX WAKE INTENSITY

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    THERE DOES NOT EXIST TODAY A UNIFIED MEANS OF EVALUATING THE VORTEX INTENSITY BEHIND COMMERCIAL JET LINERS PRIOR TO PROTOTYPE DEVELOPMENT AND TESTING AT FULLSCALE. OVER THE PAST SEVERAL YEARS, DATA AND ANALYTICAL DEVELOPMENTS HAVE PROVIDED MUCH ADDITIONAL TECHNOLOGY WHICH MAY MAKE POSSIBLE THE PREDICTION OF WAKE INTENSITY AND DECAY FROM FIRST PRINCIPLES. THE OBJECT OF THIS INVESTIGATION IS TO DEMO ...

    SBIR Phase II 1985 Department of Transportation
  10. UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT.

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT. THESE STANDARDS ARE SET TO AVOID A LANDING ENCOUNTER WITH A VORTEX WAKE. IF AN ONBOARD VORTEX SENSOR AN ESCAPE SYSTEM COULD BE DEVELOPED WHICH IS BOTH RELIABLE AND INEXPENSIVE, THE A AVIATION COMMUNITY COULD BENEFIT BY DECREASED TERMINAL DELAYS WITHOUT COMPROMISING SAFETY. THE CONCEPT TO BE ST ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government