You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Improved Transit Rider Experience

    SBC: MERCURY DATA SYSTEMS, INC.            Topic: 121FT1

    We propose to develop an advanced navigation solution for public transportation passengers that will guide them from their origin to single or multiple destination points and across multiple modes of transportation. Passengers will simply need to enter their destination (and optionally a starting point) and the system will select optimal and alternative routes. The navigation software will run on ...

    SBIR Phase I 2012 Department of Transportation
  2. Ka-band Spread Spectrum

    SBC: FIRST RF CORPORATION            Topic: SOCOM12001

    SATCOM On-The-Move (OTM) is one of the greatest operational and tactical advantages our troops have. The SATCOM terminals available pose a number of practical constraints resulting in less than universal usage. Traditional reflectors are high profile and difficult to integrate on aircraft and ground vehicles. The ability to maintain link during high-g maneuvers such as travelling over rough terr ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  3. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  4. Development of enhanced active damping system for the Marine Corps Expeditionary Fighting Vehicle (EFV)

    SBC: ACTIVE SHOCK, INC.            Topic: N04192

    A semi-active suspension upgrade kit for the SOCOM up-armored HMWWV will be developed that will achieve comparable performance for the entire weight range of a GMV: 8300lbs curb weight to 14,500lbs combat loaded. The baseline performance requirement is equivalent handling, stability and ride quality as an M1113 HMMWV at rated GVW. A dynamic model that incorporates the semi-active suspension into ...

    SBIR Phase II 2006 Department of DefenseSpecial Operations Command
  5. Covert Modular Situational Awareness Monitor

    SBC: ADA TECHNOLOGIES, INC.            Topic: SOCOM05010

    A need exists for inexpensive, disposable, broadcast capable chemical / explosive-compound sensors that also provide site weather conditions. The state-of-the-art does not meet the need described both in terms of CWA sensor cost/size and lack of a low-cost deployment system. ADA proposes under this three-phased SBIR program to develop a system comprised of a suite of covert, modular, lightweight ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  6. Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft

    SBC: FIRST RF CORPORATION            Topic: SOCOM06002

    Current methods of transmitting low-frequency RF energy from airborne platforms involve antennas such as blades that are electrically inefficient and a place a large aerodynamic burden on the airframe. SOCOM desires a method of efficiently transmitting low-frequency energy (VHF-UHF) at high power levels from airborne platforms. The desired gain numbers (-2 to 0 dB) at these frequencies would requi ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  7. Automated Detection and Cueing

    SBC: PERCEPTEK            Topic: SOCOM06001

    The single most effective method to thwart security threats posed by people with hostile intent is to detect their presence early. Unfortunately, large scale standoff detection of humans is difficult. Various sensors, including still and video cameras, have been designed and applied to human detection, however, to date a person is required to be in the detection loop since robust, automated detect ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  8. MOCA: Monitoring of Crowd Activities

    SBC: SECURICS, INC.            Topic: SOCOM06014

    The MOCA project will develop a network-enabled DSP+FPGA-enhanced image-intensified embedded system for self-contained low-power monitoring of crowds in open and in complex urban terrain. The Phase I effort will develop new algorithms explicitly for crowd management, rather than building on the traditional intelligent video surveillance algorithms that are focused on isolated targets in motion. P ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  9. A Fusion Based Tactical Biometric Registration and Recognition Toolset

    SBC: SPACEFLIGHT SYSTEMS CORP            Topic: SOCOM06004

    Human biometric recognition systems are essential in the automated personal identification and verification applications market. This market spans the commercial and military sectors to include a myriad of identification applications from secure entrance, to time card clocks, to bio-certified delivery systems, to automobiles that recognize their drivers, to money transaction systems, to weapons th ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  10. AN ICING DETECTION SYSTEM BASED ON OPTICAL REFRACTOMETRIC TECHNIQUES IS DECRIBED IN THE PROPOSAL.

    SBC: First Omega Group Inc            Topic: N/A

    AN ICING DETECTION SYSTEM BASED ON OPTICAL REFRACTOMETRIC TECHNIQUES IS DECRIBED IN THE PROPOSAL. THE FIRST OMEGA GROUP, INC. PROPOSES TO DEMONSTRATE THE APPLICABILITY OF THIS CONCEPT TO ENABLE THE CONSTRUCTION OF INSTRUMENTATION THAT AUTOMATICALLY DETERMINES THE ONSET, DURATION, ACCU MULATION AND DISSOLUTION OF ICING ON AIRPORT RUNWAYS, PARKEDAIRCRAFT, AIRPORT NAVIGATIONAL AID STRUCTURES, ETC. TH ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government