You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
Data Fusion Approach for the Effective Inspection of Prestressed Concrete
SBC: FDH Engineering Inc. Topic: 141FH1While many inspection technologies are available to find corrosion in steel tendons of prestressed concrete, no single technology has shown consistent results over the wide range of prestressed structures and inspection settings that are required from the bridge infrastructure market. However, a new NDE method – Nonlinear Impact Resonance Spectroscopy (NIRS) – shows promise in identifying corr ...
SBIR Phase I 2014 Department of Transportation -
Advanced Opaque Armor Materials and Manufacturing Methods
SBC: Corvid Technologies LLC Topic: SOCOM14003Corvid Technologies is proposing an inconspicuous armor solution for SOCOM NSCVs that will offer less costly installation than the current steel shell. This effort will benefit from Corvid"s experience in rapid development of specialized low cost armor systems. Armor coverage of the vehicle will be complete, providing multi-hit STANAG 4569 Level II protection while also reducing weight. Integr ...
SBIR Phase I 2014 Department of DefenseSpecial Operations Command -
Improved Transit Rider Experience
SBC: MERCURY DATA SYSTEMS, INC. Topic: 121FT1We propose to develop an advanced navigation solution for public transportation passengers that will guide them from their origin to single or multiple destination points and across multiple modes of transportation. Passengers will simply need to enter their destination (and optionally a starting point) and the system will select optimal and alternative routes. The navigation software will run on ...
SBIR Phase I 2012 Department of Transportation -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission