You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Real Time Signal State Transition Software for ATC- NTCIP Interface

    SBC: Advanced Technologies, Inc            Topic: 06FH1

    Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...

    SBIR Phase II 2012 Department of Transportation
  2. Extreme-Speed Eigensolver Suite

    SBC: Accelogic, LLC            Topic: 40a

    One of the most important numerical problems in science and engineering is that of finding the eigenvalues and eigenvectors of large-scale matrices. Methods for the solution of these problems, usually called eigensolvers, are fundamental to many industrial and scientific applications ranging from computational chemistry problems to structural design, to other modeling- and simulation- intense disc ...

    SBIR Phase II 2012 Department of Energy
  3. Power Efficient Supercomputing

    SBC: Cognitive Electronics Llc            Topic: 35d

    Datacenters house server farms that perform many different jobs ranging from search engines to supercomputing. In aggregate these computer systems already consume enormous power, and their energy requirements are increasing both in absolute terms and in proportion to the total capacity of the United States electrical grid. With higher power consumption has come greater difficulty in keeping these ...

    SBIR Phase II 2012 Department of Energy
  4. Novel Polishing Process to Fabricate Ultra Low Thickness Variation Diamond Substrates for Next Generation Beam Tracking Detectors

    SBC: Sinmat Inc            Topic: 45b

    Diamond crystals with small total thickness variation (TTV) and local thickness variation (LTV) values are needed for position sensitive fast particle detectors for particle tracking/timing, and detecting direct/indirect beams. The fabrication of ultra-flat, low surface defectivity diamond detectors represents a major technological challenge. Although current commercial technology can produce 100m ...

    SBIR Phase II 2012 Department of Energy
  5. Polarized 3He Circulating Technologies for Neutron Analyzers

    SBC: XEMED LLC            Topic: 18b

    The United States and several other countries are investing in new neutron scattering facilities as well as upgrading existing ones due to their promise for fundamental and applied research that can catalyze advances in energy, telecommunications, manufacturing, plastics, transportation, biotechnology, and health. The performance of one new type of instrument, the wide-angle polarized neutron spec ...

    SBIR Phase II 2012 Department of Energy
  6. Enhanced Small Arms Ammunition

    SBC: LIBERTY AMMUNITION, INC.            Topic: SOCOM06008

    Historically, small arms ammunition has been limited in it's performance due to dated projectile designs. Recently, Liberty Ammunition has introduced a novel patented projectile design, which optimizies accuracy, range, hard and soft target perfomance in a single round. This innovation increases the capability of existing small arms and eliminates the need for users to carry more than one typ ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  7. Advanced Longevity System for the Environmental Protection of Electrochromic Materials

    SBC: ECLIPSE ENERGY SYSTEMS, INC.            Topic: AF06019

    Eclipse has a variable transmittance coating to meet the requirement for a single day/night visor for aircrews. The Eclipse Electrochromic Device (EclipseECD) is well suited for light modulation applications. The EclipseECD modulates transmitted light intensity over a broad range (80% to 20% transmission) by changing optical density under an applied electric field (1.5V). This process is reversed ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  8. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  9. Development of a Large-Area Mercuric Iodide Photodetector for Scintillation Spectroscopy

    SBC: Constellation Technology            Topic: N/A

    61036 This project will develop HgI2 photodetectors, used in nuclear physics research, with resolution better than 6% for 662 keV. In Phase I, a process for manufacturing HgI2 photodetectors was developed. The detectors had a Full Width Half Max (FWHM) resolution between 5.6% and 6.6%, with an average of 6.2% FWHM for 9 out of 10 operational units produced. Phase II will fine tune performan ...

    SBIR Phase II 2001 Department of Energy
US Flag An Official Website of the United States Government