You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Compact Turbo-Rankin Energy Conversion System

    SBC: CREARE LLC            Topic: 8211

    Creare is developing a miniature power system for NOA weather monitoring stations in remote locations. This system can provide electric power continuously from naturally occurring temperature differences that exist between ambient air and water in environments such as the Arctic Ocean and the Great Lakes. Generating power directly from these temperature difference uses the atmosphere and ocean/lat ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Multimodal Acoustic Tool for Inline Pipe Inspection

    SBC: CREARE LLC            Topic: 180PH1

    The United States has a vast network of pipelines used for fuel transport. This infrastructure, installed in 1950–1970, is one of the largest in the world. Yet poor/missing records of the materials used, combined with the overall age and associated environmental degradation effects, often results in unsafe operation. Current non-destructive inspection techniques are only capable of detecting mat ...

    SBIR Phase II 2019 Department of Transportation
  3. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  4. Creating a Global Infrastructure for Virtual Aids to Navigation (vATON

    SBC: WisdomTools Enterprises Inc            Topic: N/A

    As we look towards the next decade there are many opportunities to enhance services for navigation which compliment, enhance, and replace existing Aids to Navigation technologies. This Phase II project will continue the US Coast Guard¿s investigation of the development of a Virtual Aids to Navigation system by building a working prototype that delivers real-time data to the mariner. The vATON s ...

    SBIR Phase II 2001 Department of Transportation
US Flag An Official Website of the United States Government