You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Cost, Lightweight, High Performance Transparent Armor

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    For military aircraft and land vehicles, there is a need for lightweight transparent armor that will provide a high level of ballistic protection at moderate cost. Hardfaced armor provides protection against (pointed) projectiles at very low arealdensities relative to other armor configurations. The current transparent hardface materials are either unaffordably expensive (sapphire, ALON), or low ...

    SBIR Phase II 2001 Department of DefenseSpecial Operations Command
  2. Roadway Pavement Condition Sensor

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    This Phase II SBIUR (Small Business Innovative Research) proposal is based on work accomplished by Foster-Miller, Inc. and Battelle Memorial Institute during a prior Phase I SBIR program under contract DTRS57-99-C-00090. The purpose of the Phase I program was to develop an in-vehicle sensor to measure roadway surface conditions and, from these measurements, determine the coefficient of friction b ...

    SBIR Phase II 2001 Department of Transportation
  3. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government