You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Real Time Signal State Transition Software for ATC- NTCIP Interface

    SBC: Advanced Technologies, Inc            Topic: 06FH1

    Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...

    SBIR Phase II 2012 Department of Transportation
  2. Enhanced Small Arms Ammunition

    SBC: LIBERTY AMMUNITION, INC.            Topic: SOCOM06008

    Historically, small arms ammunition has been limited in it's performance due to dated projectile designs. Recently, Liberty Ammunition has introduced a novel patented projectile design, which optimizies accuracy, range, hard and soft target perfomance in a single round. This innovation increases the capability of existing small arms and eliminates the need for users to carry more than one typ ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  3. Advanced Longevity System for the Environmental Protection of Electrochromic Materials

    SBC: ECLIPSE ENERGY SYSTEMS, INC.            Topic: AF06019

    Eclipse has a variable transmittance coating to meet the requirement for a single day/night visor for aircrews. The Eclipse Electrochromic Device (EclipseECD) is well suited for light modulation applications. The EclipseECD modulates transmitted light intensity over a broad range (80% to 20% transmission) by changing optical density under an applied electric field (1.5V). This process is reversed ...

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  4. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  5. Development of a Non-Forgeable Handicapped Parking Placard

    SBC: MAINSTREAM ENGINEERING CORPORATION            Topic: N/A

    Unfortunately, forgery is becoming even more common in our world. Everyday, crooks forge money, identification cards, documents, drivers licenses, and even forge handicapped parking placards. This problem has gone too far. As a response to this problem, the Federal Highway Administration (FHWA) is currently seeking alternative ways to create a handicapped parking placard that is difficult to fo ...

    SBIR Phase I 2001 Department of Transportation
  6. A Low-Cost IR-Enhanced Video System for Early Obstacle Warning

    SBC: CREARE LLC            Topic: N/A

    More than 6,000,000 auto accidents occur in the U.S. each year, with about one third resulting in injury and 40,000 resulting in fatality. Approximately thirteen percent of these crashes involve pedestrians. A much broader group of generalized roadway obstacles including pedestrians, other automobiles and non-fixed objects, is responsible for over ninety percent of the accidents. A reasonably p ...

    SBIR Phase I 2001 Department of Transportation
  7. 3D Terrestrial Imagery User Interface for Driveway Access Management

    SBC: SIMWRIGHT, INC.            Topic: N/A

    New developments in tools for exploitation of stereo aerial photography now enable desktop Windows applications capable of interfacing with existing GIS databases. One area of potential use for these tools is in the area of Highway Access Management especially as it relates to improvement in the process for Highway Driveways. Research is proposed to determine system requirements for using a digi ...

    SBIR Phase I 2001 Department of Transportation
  8. GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government