You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Real Time Signal State Transition Software for ATC- NTCIP Interface
SBC: Advanced Technologies, Inc Topic: 06FH1Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...
SBIR Phase II 2012 Department of Transportation -
The Characterization and Mitigation of Radiation Effects on Nano-technology Microelectronics
SBC: Defense Electronics Corporation Topic: DTRA121002Defense Electronics Corporation (DEC) proposes an innovative radiation hardened by design (RHBD) and reliability improvement solution for silicon, III-V compounds (e.g. SiGe, SiC, GaN, InP, GaAs,), carbon nanotubes (CNT), and graphene. The method is based on analyzing chip-partitioned quiescent current signatures associated with failure modes common to these process technologies. Furthermore, the ...
SBIR Phase I 2012 Department of DefenseDefense Threat Reduction Agency -
Enhanced Small Arms Ammunition
SBC: LIBERTY AMMUNITION, INC. Topic: SOCOM06008Historically, small arms ammunition has been limited in it's performance due to dated projectile designs. Recently, Liberty Ammunition has introduced a novel patented projectile design, which optimizies accuracy, range, hard and soft target perfomance in a single round. This innovation increases the capability of existing small arms and eliminates the need for users to carry more than one typ ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Advanced Longevity System for the Environmental Protection of Electrochromic Materials
SBC: ECLIPSE ENERGY SYSTEMS, INC. Topic: AF06019Eclipse has a variable transmittance coating to meet the requirement for a single day/night visor for aircrews. The Eclipse Electrochromic Device (EclipseECD) is well suited for light modulation applications. The EclipseECD modulates transmitted light intensity over a broad range (80% to 20% transmission) by changing optical density under an applied electric field (1.5V). This process is reversed ...
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Development of a Non-Forgeable Handicapped Parking Placard
SBC: MAINSTREAM ENGINEERING CORP Topic: N/AUnfortunately, forgery is becoming even more common in our world. Everyday, crooks forge money, identification cards, documents, drivers licenses, and even forge handicapped parking placards. This problem has gone too far. As a response to this problem, the Federal Highway Administration (FHWA) is currently seeking alternative ways to create a handicapped parking placard that is difficult to fo ...
SBIR Phase I 2001 Department of Transportation -
A Low-Cost IR-Enhanced Video System for Early Obstacle Warning
SBC: CREARE LLC Topic: N/AMore than 6,000,000 auto accidents occur in the U.S. each year, with about one third resulting in injury and 40,000 resulting in fatality. Approximately thirteen percent of these crashes involve pedestrians. A much broader group of generalized roadway obstacles including pedestrians, other automobiles and non-fixed objects, is responsible for over ninety percent of the accidents. A reasonably p ...
SBIR Phase I 2001 Department of Transportation -
3D Terrestrial Imagery User Interface for Driveway Access Management
SBC: SIMWRIGHT, INC. Topic: N/ANew developments in tools for exploitation of stereo aerial photography now enable desktop Windows applications capable of interfacing with existing GIS databases. One area of potential use for these tools is in the area of Highway Access Management especially as it relates to improvement in the process for Highway Driveways. Research is proposed to determine system requirements for using a digi ...
SBIR Phase I 2001 Department of Transportation -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission