You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Intelligent Dimension Evaluation and Alerting System (IDEAS)
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 111FH3Low or narrow bridges are often hit by legal-sized commercial vehicles and oversize vehicles often strike regulation bridges. In both cases the accidents result in extensive property damage, possible personal injuries and even death, and increased traffic congestion. Past attempts to warn drivers of risks for bridge hits have failed due to inaccurate measurement, high rates of false alarms, or s ...
SBIR Phase II 2012 Department of Transportation -
Transportation Autonomous Device
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 101FR4Job related injuries cost the railroads over $1 billion annually and from 2005 through 2008 30.3% of those injuries occurred in the rail yard. A majority of the accidents were attributed to slips, trips and falls from the worker slipping on ballast or tripping on other trackside objects. IEM is developing a Transportation Autonomous Device that may be configured to work autonomously, with a remote ...
SBIR Phase II 2012 Department of Transportation -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Transportation Autonomous Device
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 101FR4Railroad yards are in constant movement with potentially thousands of train cars moving over miles of track compressed into a limited area. The harsh environment presents many safety hazards for railroad workers who must move through this environment and perform assigned tasks. Job related injuries cost he railroads over $1 billion annually and from 2008 30.3% of those injuries occurred in the r ...
SBIR Phase I 2010 Department of Transportation -
Cut and Puncture Resistant Low Mass Diver Dry Suit with High Mobility
SBC: WARWICK MILLS INC Topic: SOCOM10001We propose to provide essential protection from lacerations, punctures and abrasion for SOCOM’s free swimming diver force using a multi-layer laminate. The key technology will employs a novel stretch-pleat design with a proven puncture and cut resistant fabric that will allow a lower diving mass ensemble with a focus on mobility. The core puncture and cut layer is based on a lightweight punctur ...
SBIR Phase I 2010 Department of DefenseSpecial Operations Command -
Crossing Hazard Intelligent Alert System (CHIAS)
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 101FR2Railroad grade crossings remain one of the primary locations for fatal or near-fatal accidents involving rail vehicles. Multiple attempts to prevent such accidents by means such as signals and gates are severely hampered both by expense of installation and by the fact that many accidents are caused by vehicle drivers or pedestrians deliberately or through inattention ignoring or evading warnings ...
SBIR Phase I 2010 Department of Transportation -
Innovative Automated Morse Code System
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: N/AIn the Phase I of the proposed effort, IEM will produce an innovative automatic CW Morse Code system which will operate on a HF radio. The proposed system will be low power, small, light weight and useable by typical personnel. IEM will perform anexhaustive search for all components to look for suitable COTS solutions. Innovative approaches, designs, and solutions will then be combined with COTS s ...
SBIR Phase I 2001 Department of DefenseSpecial Operations Command -
A Low-Cost IR-Enhanced Video System for Early Obstacle Warning
SBC: CREARE LLC Topic: N/AMore than 6,000,000 auto accidents occur in the U.S. each year, with about one third resulting in injury and 40,000 resulting in fatality. Approximately thirteen percent of these crashes involve pedestrians. A much broader group of generalized roadway obstacles including pedestrians, other automobiles and non-fixed objects, is responsible for over ninety percent of the accidents. A reasonably p ...
SBIR Phase I 2001 Department of Transportation -
A PROOF-OF-CONCEPT PROJECT SHOWING FEASIBILITY OF A SEMIAUTOMATIC SYSTEM INTEGRATING ILS, MLS AND EN ROUTE NAVIGATION FOR LIGHT AIRCRAFT IS PROPOSED.
SBC: Genovese Associates Topic: N/AA PROOF-OF-CONCEPT PROJECT SHOWING FEASIBILITY OF A SEMIAUTOMATIC SYSTEM INTEGRATING ILS, MLS AND EN ROUTE NAVIGATION FOR LIGHT AIRCRAFT IS PROPOSED. THE PURPOSE OF THE SYSTEM IS TO INCREASE NAVIGATION PRESISION AND S D SIMPLICITY, ESPECIALLY IN THE RNAV AND MLS ENVIRONMENTS. THESYSTEM WOULD ALSO ENHANCE AIR TRAFFIC CONTROL CAPACITY, REDUCE PILOT WORKLOAD, AND IMPROVE SAFETY MARGINS. INFORMATION W ...
SBIR Phase I 1985 Department of Transportation -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission