You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Quantitative Non-destructive Residual Stress Assessment Tool for Pipelines

    SBC: Generation 2 Materials Technology Llc            Topic: 111PH2

    There exists a wide-range need in both industry and government for quantitative residual stress measurements. Generation 2 Materials Technology LLC (G2MT) will collaborate with partners from industry and government to calibrate and commercialize the eStress system to assess residual stress from mechanical damage and re-rounding. The industrial members, consortiums, and government laboratories who ...

    SBIR Phase II 2012 Department of Transportation
  2. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  3. A Low-Cost IR-Enhanced Video System for Early Obstacle Warning

    SBC: CREARE LLC            Topic: N/A

    More than 6,000,000 auto accidents occur in the U.S. each year, with about one third resulting in injury and 40,000 resulting in fatality. Approximately thirteen percent of these crashes involve pedestrians. A much broader group of generalized roadway obstacles including pedestrians, other automobiles and non-fixed objects, is responsible for over ninety percent of the accidents. A reasonably p ...

    SBIR Phase I 2001 Department of Transportation
  4. Utilization of Native Grass and Forb Meadows as a Source for Native Seed

    SBC: Solis Environmental            Topic: N/A

    Mandates to use native wildflower and grass seed began in 1987 with the Surface Transportation and Uniform Relocation Assistance Act and have been reinforced by two Executive Orders. Current demand for native seed exceeds the supply therefore the need exists to develop additional native seed sources.

    SBIR Phase I 2001 Department of Transportation
  5. Active Automated Diagnostic System for Aircrafts

    SBC: WILLIAMSRDM, INC.            Topic: N/A

    Aircraft wire damage can be caused by aging, maintenance, vibration, exposure to moisture, and many other factors. However, current wire maintenance and inspection methods are often insufficient to detect these frequent problems. Williams-Pyro, Inc. proposes to develop an aircraft wire maintenance system that detects wiring problems and analyzes the type of fault. This system, called Active Aut ...

    SBIR Phase I 2001 Department of Transportation
  6. Not Available

    SBC: CREARE LLC            Topic: N/A

    Not Available This project addresses the development of novel atmospheric retrieval and corrections methodology for air- or space-borne hyperspectral imaging that is based on a robust physical propagation model. Atmospheric retrieval is a classical inverse problem that

    SBIR Phase I 2000 Department of Transportation
  7. HOLD

    SBC: Airdex Corpon            Topic: N/A

    THE TIME REQUIRED FOR CLEANING, DEHUMIDIFYING AND PURGING OFCARGO HOLDS HAS A DIRECT EFFECT ON THE TURN AROUND TIME OF VESSELS CARRYING MOISTURE SENSITIVE GOODS IN PORT. THIS PROPROJECT WILL THOROUGHLY RESEARCH THE REQUIREMENTS FOR DEHUMIDIFICATION, DEVELOP DESIGN CRITERIA, DESIGN CRITERIA , DESIGN A REFRIGERANT TYPE DEHUMIDIFIER, CONSTRUCT A PROTO TYPE, AND TEST THE EQUIPMENT IN THE FIELD. PARTIC ...

    SBIR Phase I 1985 Department of Transportation
  8. COLLISION AVOIDANCE TECHNIQUE USED BY THE MAJOR RAILROADS OF THE US STILL RELY ON THE ALERTNESS OF THE LOCOMOTIVE ENGINEER TO SEE AND RESPOND TO WARNING SIGNALS DISPLAYED IN THE ENGINE COMPARTMENT AND ALONG THE RIGHT-OF-WAY.

    SBC: Expert Systems Engineers            Topic: N/A

    COLLISION AVOIDANCE TECHNIQUE USED BY THE MAJOR RAILROADS OF THE US STILL RELY ON THE ALERTNESS OF THE LOCOMOTIVE ENGINEER TO SEE AND RESPOND TO WARNING SIGNALS DISPLAYED IN THE ENGINE COMPARTMENT AND ALONG THE RIGHT-OF-WAY. SO LONG AS THE ENGINEER REMAINS ALERT, THE SYSTEM WORKS WELL, BUT WHEN THE ENGINEER IS NOT QUICK TO PERCEIVE AND REACT TO DANDER SIGNALS, THE SYSTEM FAILS. MAINTAINING ENGINEE ...

    SBIR Phase I 1985 Department of Transportation
  9. GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission