You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Dual Speed Read Out Integrated Circuit (ROIC)

    SBC: RNET TECHNOLOGIES INC            Topic: SOCOM12003

    This SBIR requires the development of an innovative dual speed ROIC (DSROIC) architecture, mated to a detector array within the band of interest and with suitable response speed. According to the solicitation, this effort will establish a DSROIC concept capable of performing conventional staring imaging at video frame rates, while simultaneously being able to process and detect each frame at a hi ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  2. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  3. Development of enhanced active damping system for the Marine Corps Expeditionary Fighting Vehicle (EFV)

    SBC: ACTIVE SHOCK, INC.            Topic: N04192

    A road wheel suspension incorporating a semi-active damper and fast load leveling spring system will be developed for the Expeditionary Fighting Vehicle (EFV). The system will be designed as a replacement for the currently fielded semi-active suspension system in the same foot print, either in early production units or as a retrofit package for incorporation later in the development cycle. A sus ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
  4. SOF Tactical Repeater

    SBC: NOVA ENGINEERING, INC.            Topic: SOCOM04006

    Special Operations Forces face a variety of scenarios that limit communications. Blockage by urban structures, urban and rural terrain obstacles, and a desire for over-the-horizon communication dictate the need for a tactical repeater. The proposed research will analyze candidate repeater architectures. Emphasis will be placed on cost, size, weight, power, functionality, time-to-market, ruggedn ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  5. Development of Fiber Optic Approach Lighting Systems Part One: Development of LED Threshold Lights

    SBC: Lighting Innovations, LLC            Topic: N/A

    The incandescent lamps used in the green threshold lamps that form a line on the front end of an airport runway, have relatively short lives and require constant maintenance. The green filters used in front of the lamps transmit only about 20% of the light. Green light emitting diodes (LEDs) have been improved recently and are reaching brightness levels making it possible to use them in traffic ...

    SBIR Phase I 2001 Department of Transportation
  6. Development of Fiber Optic Approach Lighting Systems Part One: Development of LED Threshold Lights

    SBC: Lighting Innovations, LLC            Topic: N/A

    The incandescent lamps used in the green threshold lamps that form a line on the front end of an airport runway, have relatively short lives and require constant maintenance. The green filters used in front of the lamps transmit only about 20% of the light. Green light emitting diodes (LEDs) have been improved recently and are reaching brightness levels making it possible to use them in traffic ...

    SBIR Phase II 2001 Department of Transportation
  7. Development of Fiber Optic Approach Lighting Systems Part One: Development of LED Threshold Lights

    SBC: Lighting Innovations, LLC            Topic: N/A

    The incandescent lamps used in the green threshold lamps that form a line on the front end of an airport runway, have relatively short lives and require constant maintenance. The green filters used in front of the lamps transmit only about 20% of the light. Green light emitting diodes (LEDs) have been improved recently and are reaching brightness levels making it possible to use them in traffic ...

    SBIR Phase II 2001 Department of Transportation
  8. Development of Fiber Optic Approach Lighting Systems Part One: Development of LED Threshold Lights

    SBC: Lighting Innovations, LLC            Topic: N/A

    The incandescent lamps used in the green threshold lamps that form a line on the front end of an airport runway, have relatively short lives and require constant maintenance. The green filters used in front of the lamps transmit only about 20% of the light. Green light emitting diodes (LEDs) have been improved recently and are reaching brightness levels making it possible to use them in traffic ...

    SBIR Phase I 2001 Department of Transportation
  9. A Low-Cost IR-Enhanced Video System for Early Obstacle Warning

    SBC: CREARE LLC            Topic: N/A

    More than 6,000,000 auto accidents occur in the U.S. each year, with about one third resulting in injury and 40,000 resulting in fatality. Approximately thirteen percent of these crashes involve pedestrians. A much broader group of generalized roadway obstacles including pedestrians, other automobiles and non-fixed objects, is responsible for over ninety percent of the accidents. A reasonably p ...

    SBIR Phase I 2001 Department of Transportation
  10. High Performance Assault Zone Marking System

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: N/A

    Special Operations Forces is looking for assault zone marking systems to facilitate instrument approaches of fixed and rotary wing aircraft under extremely low ceiling/visibility conditions (200' ceiling/0.5 mile visibility). After successfully finishingthe phase-I project, in this phase-II effort, we will concentrate on the whole assault zone marking/lighting system design, calculation/simulation ...

    SBIR Phase II 2001 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government