You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
The S0 UAS, an Air Deployed Solution for Boundary Layer Observations in Turbulent Environments
SBC: BLACK SWIFT TECHNOLOGIES LLC Topic: 8213Previous efforts have demonstrated that targeted observations of tropical storms by UAS can provide extremely valuable data sets for improving forecasts and models, but are also difficult to obtain. A number of obstacles including regulations and the distance required to intercept evolving storms have limited the number of land based flights. The use of airborne deployed UAS have recently overcome ...
SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration -
A Compact Turbo-Rankin Energy Conversion System
SBC: CREARE LLC Topic: 8211Creare is developing a miniature power system for NOA weather monitoring stations in remote locations. This system can provide electric power continuously from naturally occurring temperature differences that exist between ambient air and water in environments such as the Arctic Ocean and the Great Lakes. Generating power directly from these temperature difference uses the atmosphere and ocean/lat ...
SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration -
Development of a Solar Powered Aerosol Reference Calibrator
SBC: Access Sensor Technologies LLC Topic: 813This project will develop and demonstrate an inexpensive and portable calibration system for low-cost aerosol sensors. Current calibration methods are cost prohibitive and lack generalizability from one location (or season) to the next, making them impractical for implementation. Access Sensor Technologies (AST) proposes to improve and validate a solar powered aerosol reference calibrator (SPARC) ...
SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration -
Multimodal Acoustic Tool for Inline Pipe Inspection
SBC: CREARE LLC Topic: 180PH1The United States has a vast network of pipelines used for fuel transport. This infrastructure, installed in 1950–1970, is one of the largest in the world. Yet poor/missing records of the materials used, combined with the overall age and associated environmental degradation effects, often results in unsafe operation. Current non-destructive inspection techniques are only capable of detecting mat ...
SBIR Phase II 2019 Department of Transportation -
Tactical Active Anti-Fogging Goggle or Spectacle
SBC: TDA RESEARCH, INC. Topic: SOCOM181003The military combat eye protection (MCEP) program is designed to protect our soldiers' eyes from the external threats of fragmentation, electromagnetic radiation, wind, dust, sand, etc. and greatly improve both safety and operational effectiveness. However, the goggles and spectacles on the Military’s authorized protective eyewear list (APEL) are only effective if the soldier is wearing them. Fo ...
SBIR Phase II 2019 Department of DefenseSpecial Operations Command -
Ka-band Spread Spectrum
SBC: FIRST RF CORPORATION Topic: SOCOM12001SATCOM On-The-Move (OTM) is one of the greatest operational and tactical advantages our troops have. The SATCOM terminals available pose a number of practical constraints resulting in less than universal usage. Traditional reflectors are high profile and difficult to integrate on aircraft and ground vehicles. The ability to maintain link during high-g maneuvers such as travelling over rough terr ...
SBIR Phase I 2012 Department of DefenseSpecial Operations Command -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Miniature Quickscan Receiver
SBC: AEROSTREAM COMMUNICATIONS CORPORATION Topic: SOCOM04004Develop a miniature, lowcost scanning receiver.
SBIR Phase I 2004 Department of DefenseSpecial Operations Command -
Software Package for Material Model Evaluation
SBC: APTEK, Inc. Topic: N/AThis Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...
SBIR Phase II 2004 Department of Transportation -
Advanced Vision & Position Acquisition System (AVPAS)
SBC: INSIGHT TECHNOLOGY, INC. Topic: SOCOM04005Our goal is to develop a single device or modular group of devices weighing less than three pounds that can provide all of the functionality required for individual dismounted special forces for surveillance, small arms fire control, and tactical network connectivity. This challenge requires expertise not only in each of the individual modules for day sights, night vision, range finding, GPS, com ...
SBIR Phase I 2004 Department of DefenseSpecial Operations Command