You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  2. Unipolar nBn HgCdTe on Silicon for High Performance, Low Cost NIR/SWIR Imagers

    SBC: EPIR TECHNOLOGIES INC            Topic: SOCOM12002

    We propose the development of a near infrared/shortwave infrared (NIR/SWIR) sensor based on mercury cadmium telluride (HgCdTe) in an n-type/barrier/n-type (nBn) architecture, designed for room-temperature operation in the 0.7 to 2.8µm NIR/SWIR spectral range. The sensor will compete as a low cost/high performance alternative to near infrared indium gallium arsenide (InGaAs)-based cameras by prov ...

    SBIR Phase I 2012 Department of DefenseSpecial Operations Command
  3. Electronically Controlled Pneumatic Brake System Emulator Development

    SBC: Sharma & Associates, Inc.            Topic: 121FR2

    Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. This project will investigate the feasibility of devices that can help to ease this transition by allowing ECP equipped cars to operate in a conventionally braked train, as well as devices to permit con ...

    SBIR Phase I 2012 Department of Transportation
  4. Alternative Power Sources

    SBC: SmartSpark            Topic: SOCOM04008

    SmartSpark Energy Systems proposes a battery-free power supply for unattended field use that combines advanced power electronics with state-of-the-art photovoltaics and high-density double-layer capacitors. The technical challenges are to develop and apply sophisticated power electronics for optimal energy management of a photovoltaic source, to store the energy efficiently in a reversible proces ...

    SBIR Phase I 2004 Department of DefenseSpecial Operations Command
  5. Advanced Vision & Position Acquisition System (AVPAS)

    SBC: INSIGHT TECHNOLOGY, INC.            Topic: SOCOM04005

    Our goal is to develop a single device or modular group of devices weighing less than three pounds that can provide all of the functionality required for individual dismounted special forces for surveillance, small arms fire control, and tactical network connectivity. This challenge requires expertise not only in each of the individual modules for day sights, night vision, range finding, GPS, com ...

    SBIR Phase I 2004 Department of DefenseSpecial Operations Command
  6. FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE

    SBC: Coin Systems Inc            Topic: N/A

    FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE MIS-HANDLING, EMPLOYEE FRAUD, EMPLOYEE THEFT. THIS STUDY WILL FOCUS ON THE FEASIBILITY OF IMPLEMENTING T THE ELECTRONIC/MICRO PROCESSOR BASED COLLECTION ...

    SBIR Phase I 1985 Department of Transportation
  7. GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  8. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: N/A

    During Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...

    SBIR Phase II 2004 Department of Transportation
  9. A NEW TECHNOLOGY CALLED "CHEMICAL PARAMETER SPECTROMETRY" IS MODIFIED TO BE ABLE TO ANALYZE SOLID, LIQUID, AND GASEOUSSAMPLES.

    SBC: Transducer Research Inc.            Topic: N/A

    A NEW TECHNOLOGY CALLED "CHEMICAL PARAMETER SPECTROMETRY" IS MODIFIED TO BE ABLE TO ANALYZE SOLID, LIQUID, AND GASEOUSSAMPLES. THE EXPERIMENTS PERFORMED IN THIS WORK RESULT IN THE DESIGN FOR A PROTABLE INSTRUMENT (BLACK BOX) THAT CAN IDENTIFY VIRTUALLY ALL HAZARDOUS COMMODITIES. THE HAZARD OUS SPILLS IDENTIFICATION SYSTEM IS PORTABLE, FULLY A YAUTOMATED, AND RUGGED. IT WILL IDENTIFY HAZARDOUS SUBS ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government