You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Query- Based Interoperability and CAD/CAE Integration in Assemblies
SBC: INTACT SOLUTIONS, INC Topic: N/AWe propose to design and implement a set of CAD queries by which to achieve model interchangeability in assemblies, model interoperability, and model integration for CAD/CAE. A model scenario will be used to illustrate how this can be accomplished. In Phase 1, we will establish the feasibility of the approach, develop high level algorithms and conduct software experiments to verify their efficienc ...
SBIR Phase I 2012 Department of CommerceNational Institute of Standards and Technology -
Small Integrated HFI Sensor for the AVR-2B
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: SOCOM11001"SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)
SBIR Phase II 2012 Department of DefenseSpecial Operations Command -
Development of enhanced active damping system for the Marine Corps Expeditionary Fighting Vehicle (EFV)
SBC: ACTIVE SHOCK, INC. Topic: N04192A road wheel suspension incorporating a semi-active damper and fast load leveling spring system will be developed for the Expeditionary Fighting Vehicle (EFV). The system will be designed as a replacement for the currently fielded semi-active suspension system in the same foot print, either in early production units or as a retrofit package for incorporation later in the development cycle. A sus ...
SBIR Phase I 2005 Department of DefenseSpecial Operations Command -
Cross-Layer Optimization for Mobile Ad Hoc Networks Using SCA Compatible Smart Radio
SBC: SCA Technica, Inc. Topic: N/AHomeland Security/First Responder networks require increased bandwidth and reliable connectivity. Future networks such as Project SAFECOM may deploy software-defined radios (SDR) compatible with Joint Tactical Radio System (JTRS) Software Communications Architecture (SCA). We leverage our SCA compatible, high assurance ¿Smart Radio¿ prototype being developed under an AFRL sponsored Phase II ...
SBIR Phase I 2005 Department of CommerceNational Institute of Standards and Technology -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission