You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Examination of HM Portable Tanks within Transportation System

    SBC: Intelligent Automation, Inc.            Topic: 112PH1

    Portable tanks used to transport hazard materials are often subject to forces and stress, thermal cycle loading, and shock/vibration throughout the transportation process. It is an interest to assess what effects may occur during loading and unloading from one shipping mode to another and what conditions the HM packages will experience in that specific mode. An in-situ sensor system is proposed he ...

    SBIR Phase I 2012 Department of Transportation
  2. Innovative Solutions to Effectively Enforce Anto-texting Rules on Commercial Motor Vehicles (CMV) Drivers

    SBC: Intelligent Automation, Inc.            Topic: 121FM2

    Intelligent Automation Inc. (IAI) proposes an innovative anti-texting system which does not prevent the use of any cell phone but can detect and record the texting and driving behavior for enforcement instead. This proposal lays out a concrete plan to develop a robust and cost effective system that can detect, identify and record the instances when a driver is texting (or voice calling without ha ...

    SBIR Phase I 2012 Department of Transportation
  3. Communicating Towed unit (Trailer) Vehicle Identification Number(s) (VIN) to the Powered Unit

    SBC: Intelligent Automation, Inc.            Topic: 121FM1

    Usually the lifetime of a trailer is much longer than tractors; tractors must work with a variety types and ages of trailers over the course of their use. In many scenarios (e.g., roadside, border crossing, smart parking, connected vehicle initiative, etc.), it is necessary to identify trailer(s)' VIN(s) and know their order attached to the powered unit. An automated trailer VIN identification and ...

    SBIR Phase I 2012 Department of Transportation
  4. Three dimensional detection ranging and mapping of utilities and underground infrastructure at intersections using step-frequency groung penetrating radar without traffic control

    SBC: STARODUB INC            Topic: 122FH5

    A method to detect, locate, and map utilities and underground infrastructure is proposed at traffic speeds based on recent advances in step-frequency ground penetrating radar (SFGPR). Recent work by the proposed research team has already demonstrated imaging of subsurface civil infrastructure elements such as pavement structure and inductive loop detectors embedded in the pavement. The proposed r ...

    SBIR Phase I 2012 Department of Transportation
  5. GeoRad-Next Generation High Resolution, Long Range, Flexible and Modular Ground Penetrating Radar

    SBC: Intelligent Automation, Inc.            Topic: 122FH5

    Intelligent Automation Inc (IAI) in collaboration with IDS North America proposes to develop the next generation Ground Penetration Radar (GPR) technology called GeoRad. We will leverage an existing state –of-the-art dual-frequency dual-polarized massive array GPR and improve its accuracy so that wires, and pipes can be mapped. The accuracy of the position of the ground penetration radar directl ...

    SBIR Phase I 2012 Department of Transportation
  6. Small Integrated HFI Sensor for the AVR-2B

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: SOCOM11001

    "SSSC is pleased to propose the development and delivery of a Hostile Fire Indication Sensor (HFIS) based on the Phase I design concept. The resulting system will limit the number of circuit card assemblies to two: one for the short wave infrared (SWIR)

    SBIR Phase II 2012 Department of DefenseSpecial Operations Command
  7. Development of enhanced active damping system for the Marine Corps Expeditionary Fighting Vehicle (EFV)

    SBC: ACTIVE SHOCK, INC.            Topic: N04192

    A road wheel suspension incorporating a semi-active damper and fast load leveling spring system will be developed for the Expeditionary Fighting Vehicle (EFV). The system will be designed as a replacement for the currently fielded semi-active suspension system in the same foot print, either in early production units or as a retrofit package for incorporation later in the development cycle. A sus ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
  8. Advanced Tactical Threat Warning Radio

    SBC: DIGITAL RECEIVER TECHNOLOGY, INC.            Topic: SOCOM05008

    DRT will perform an investigation to identify a feasible design approach for a handheld threat warning and communications radio through the use of reconfigurable software radio techniques. Design aspects for the RF, digital, and power supply elements will undergo careful study in orer to identify customized integrated circuits that will minimize size, weight, and power consumpion. The aspects of ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
  9. In-line Nondestructive Inspection of Mechanical Defects in Pipelines with Shear Horizonital Wave EMAT

    SBC: Intelligent Automation, Inc.            Topic: N/A

    Intelligent Automation, Inc. and Oak Ridge National Lab is proposing a novel and integrated approach to inspect mechanical damages in the pipelines with or without coatings. It extends our successful work in a previous phase 1 project that combines the state of the art Shear Horizontal wave signal processing and pattern classification techniques, to detect and characterize the mechanical dents in ...

    SBIR Phase I 2005 Department of Transportation
  10. ON-LINE PLANT ANALYZER UTILIZATION IN CONTROL ROOM FOR SURVEILLANCE OF PLANT SAFETY

    SBC: Dynatrek Inc.            Topic: N/A

    THE PRINCIPAL SCOPE OF THE PROPOSED RESEARCH IS TO DEVELOP SOFTWARE FOR A BC-CONTROLLER WHOSE PURPOSE IS TO SUPPLY AND CONSTANTLY UPDATE THE BOUNDARY CONDITIONS (BC) TO AN ON-LINE PLANT ANALYZER, ENABLING IT TO FAITHFULLY TRACK A NUMBER OF THE CONTINUOUSLY MEASURED PLANT PARAMETERS. THE BC-CONTROLLER SAMPLES PLANT MEASUREMENTS FROM THE PLANT COMPUTER MEMORY. THE PLANT ANALYZER, IN TURN, PROVIDES D ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government