You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Smart Pipeline Network- Cased Pipe for Monitoring and Sensor System
SBC: Odyssian Technology, L.L.C. Topic: 121PH3This PHMSA SBIR focuses on the development of a new multi-channel cased in pipe design with internal support structure that will allow access along its entire axial length while adequately securing the carrier pipe to the containment pipe. When combined with the Seal Sensor System (proposed separately), this technology will allow a Smart Pipeline Network having integrated sensor networks that pro ...
SBIR Phase I 2012 Department of Transportation -
Smart Pipeline Network- Pipe & Repair Sensor System
SBC: Odyssian Technology, L.L.C. Topic: 121PH2This PHMSA SBIR focuses on the development of a Pipe and Repair Sensor System. When combined with the Seal Sensor System (proposed separately), this technology will allow for a Smart Pipeline Network having integrated sensor networks that provide for continuous real-time monitoring of leaks and system health. In this program, smart pipes and smart composites repair having integrated leak detecti ...
SBIR Phase I 2012 Department of Transportation -
Smart Pipeline Network- Seal Sensor System
SBC: Odyssian Technology, L.L.C. Topic: 121PH1This PHMSA SBIR focuses on the development of a Seal Sensor System. When combined with the Pipe and Repair Sensor System (proposed separately), this technology will allow for a Smart Pipeline Network having integrated sensor networks that provide for continuous real-time monitoring of leaks and system health. In this program, sensor-seals having both sealing and force sensing functionality, as w ...
SBIR Phase I 2012 Department of Transportation -
ICING MONITORING EQUIPMENT
SBC: JONAS, INC. Topic: N/AA SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...
SBIR Phase II 1985 Department of Transportation -
GENERALIZED MODELING OF CONDENSATION FOR REACTOR APPLICATION
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission