You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Buoy Guard System

    SBC: McQ Inc.            Topic: 932W

    McQ will develop a complete conceptual design for a Buoy Guard System (BGS). This system will detect the presence of intruders at and on the buoy. It will initiate deterrent actions to persuade and force the intruders away from the buoy. It will also collect imagery and other data about the intruders and about their activities associated with the buoy. This data, along with the basic warning w ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Improving Commercial Fish Meal Free Aquaculture Diets

    SBC: Low Salinity, Inc.            Topic: 922F

    The current emphasis in fish nutrition is fish meal replacement with a variety of alternative protein sources including plant-based, terrestrial and marine proteins. We propose to focus specifically upon the protein quality of these alternate protein sources and its potential impacts on marine fish production. Animal byproduct meals created through the rendering industry are widely utilized as i ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Non-contact Track Gage Measurement System (NC-TGMS)

    SBC: DFUZION, INC.            Topic: 081FR4

    One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA. Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current systems (unr ...

    SBIR Phase I 2009 Department of Transportation
  4. Portable Active Thermographic Coating Inspection System

    SBC: Fuchs Consulting Inc            Topic: 091FH2

    This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings. This system uses active thermography where IR sources are used to provide controlled heating to a coating system. The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera. An off-the-she ...

    SBIR Phase I 2009 Department of Transportation
  5. Roadway Waste Heat Electricity Production Using Impoved Roadway Paving Technologies

    SBC: Planphoria LLC            Topic: 091FH5

    Planphoria will research, define and develp methods to turn our nation's roadways into a giant energy collection and transference system that produces low cost electrical energy close to point of use. Though roadway environmental conditions change, and different roadway requirements vastly differ from the requirements of other roadways, we will determine the feasibility of this concept by leading ...

    SBIR Phase I 2009 Department of Transportation
US Flag An Official Website of the United States Government