You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: N/A

    Cities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...

    SBIR Phase I 2008 Department of Transportation
  2. FLAME RETARDANT FLEXIBLE POLYURETHANE FOAM FINDS WIDESPREAD COMMERCIAL USE AS A SEATING MATERIAL DUE TO ITS FAVORABLE COST, SUPPORT, AND RESILIENCE CHARACTERISTICS.

    SBC: Springborn Materials Science            Topic: N/A

    FLAME RETARDANT FLEXIBLE POLYURETHANE FOAM FINDS WIDESPREAD COMMERCIAL USE AS A SEATING MATERIAL DUE TO ITS FAVORABLE COST, SUPPORT, AND RESILIENCE CHARACTERISTICS. HOWEVER, SMOKE AND TOXIC GAS EVOLUTION IN THE EVENT OF FIRE IS A MAJOR PROBLEM. THE GOAL OF THIS PROGRAM IS TO CREATE A FIRE RESISTANT COMPOSITE FOAM STRUCTURE WHICH WILL GENERATE NEGLIGIBLE QUANTITIES OF TOXIC FUMES WHEN EXPOSED TO FI ...

    SBIR Phase I 1984 Department of Transportation
US Flag An Official Website of the United States Government