You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Design, Development and Testing of Optimized Composite "Soft Crack Arrestors"

    SBC: ENGINEERING MECHANICS CORPORATION OF COLUMBUS            Topic: 07PH1

    Emc2's proposal provided to DOT in response to SBIR Research topic 07-PH1 on "Design Optimization for Soft Crack Arrestors" focuses on the development of key material property data needed to design "soft crack arrestors". This testing will be done over a range of temperatures to cover extreme conditions for future pipeline designs. It is also essential to develop this data at the loading rates t ...

    SBIR Phase I 2008 Department of Transportation
  2. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: N/A

    Cities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...

    SBIR Phase I 2008 Department of Transportation
US Flag An Official Website of the United States Government