You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS.

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS. THE FOCUS OF THE RESEARCH IS TO CONTROL THE ROBOT TOOL CONTROL POINT (TCP) THROUGH AN ADAPTIVE FEEDBACK CONTROL SYSTEM. THE ROLE OF THE FEEDBACK CONTROL SYSTEM IS TO CONTROL AND MODIFY THE PATH OF THE TCP TO WIT ...

    SBIR Phase I 1984 Department of DefenseNavy
  2. THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO FRAME RATES OF 30 FRAMES PER SECOND. THE SYSTEM CONFIGURATION UNDER INVESTIGATION WILL UTILIZE PARALLEL PROCESSING OF RAW VIDEO INPUT FROM MULTIPLE C ...

    SBIR Phase I 1984 Department of DefenseNavy
  3. DEVELOPMENT OF A RUGGEDIZED LOW COST MICROCOMPUTER

    SBC: Kms Fusion Inc            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
US Flag An Official Website of the United States Government