Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. On-board Smart Vision System to Support Vehicle-to-Infrastructure (V2I) Communication

    SBC: Connected Wise LLC            Topic: 180FH1

    Connected automated vehicle (CAV) technology has significant implications in terms of transportation system safety and efficiency. However, building and maintaining a wireless communication infrastructure (e.g. roadside units (RSUs), power, fiber optic lines etc.) across the U.S. is a challenging task. In urban areas, where vehicle population and vehicle-miles-traveled (VMT) are high, building suc ...

    SBIR Phase II 2019 Department of Transportation
  2. Guided Augmented Independence Travel Aid (GAIT-Aid)

    SBC: Design Interactive, Inc            Topic: 180FT1

    Lack of transportation access affects approximately 30% of people with functional limitations. In fact, people with functional limitations experience transportation access barriers four times more than those without limitations. With the emerging market of low cost augmented and virtual reality technology, perceptual user interfaces (PUI) that interact more naturalistically with end-users are prov ...

    SBIR Phase II 2019 Department of Transportation
  3. Decentralized, Public, and Mobile-Based Sidewalk Inventory Tool

    SBC: KNOWLEDGE BASED SYSTEMS, INC.            Topic: 142FH1

    Knowledge Based Systems, Inc. (KBSI) is pleased to propose the further design and development of MySidewalk mobile application facilitating the crowd-sourced collection of sidewalk inventory and condition data. The MySidewalk application utilizes advances in social networks and data mining to provide integrated sidewalk datasets. Phase I and II research was facilitated by inputs from City of Colle ...

    SBIR Phase II 2019 Department of Transportation
  4. Long Life, Low Cost Mini-Roundabouts from Simple Modular Shapes and Recycled

    SBC: ZKxKZ, LLC            Topic: 142FH3

    In Phase II, ZKxKZ designed, developed and demonstrated an approach for fabrication and rapid installation of low cost modular mini-roundabouts made from recycled plastic boards. Phase II culminated in the installation of one full modular mini-roundabout in both Georgia and Virginia. In addition, 3 modular mini-roundabouts were commercially sold and installed in Canada prior to the SBIR funded sit ...

    SBIR Phase II 2019 Department of Transportation
  5. Collaboration-Optimized Network for Naturalistic Exploration and Communication about Traffic

    SBC: Aptima, Inc.            Topic: 180NH2

    Current access to and analysis of the Fatal Analysis Reporting System (FARS) dataset requires significant time and technical skill. Data analysis tools are often general-purpose, designed to support the analysis of any dataset, and do not easily support the types of questions many transportation and safety engineers ask of the FARS data. Visualizations can help users understand relationships betwe ...

    SBIR Phase II 2019 Department of Transportation
US Flag An Official Website of the United States Government