You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Combined Cleaning and Guided Wave Inspection System for Hazardous Liquid Pipelines

    SBC: ULC TECHNOLOGIES LLC            Topic: 180PH2

    Pipeline operators employ cleaning tools for improving product throughput, inhibiting corrosion, and preparing their pipes for inline inspection. For many pipeline risk models, improving the scope and quality of input data is a long-term process. If the combined cost of pigging and inspecting was low and could be done simultaneously, pipeline operators would be encouraged to perform inspections mo ...

    SBIR Phase II 2019 Department of Transportation
  2. Collaboration-Optimized Network for Naturalistic Exploration and Communication about Traffic

    SBC: APTIMA INC            Topic: 180NH2

    Current access to and analysis of the Fatal Analysis Reporting System (FARS) dataset requires significant time and technical skill. Data analysis tools are often general-purpose, designed to support the analysis of any dataset, and do not easily support the types of questions many transportation and safety engineers ask of the FARS data. Visualizations can help users understand relationships betwe ...

    SBIR Phase II 2019 Department of Transportation
  3. Long Life, Low Cost Mini-Roundabouts from Simple Modular Shapes and Recycled

    SBC: ZKXKZ LLC            Topic: 142FH3

    In Phase II, ZKxKZ designed, developed and demonstrated an approach for fabrication and rapid installation of low cost modular mini-roundabouts made from recycled plastic boards. Phase II culminated in the installation of one full modular mini-roundabout in both Georgia and Virginia. In addition, 3 modular mini-roundabouts were commercially sold and installed in Canada prior to the SBIR funded sit ...

    SBIR Phase II 2019 Department of Transportation
  4. Decentralized, Public, and Mobile-Based Sidewalk Inventory Tool

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: 142FH1

    Knowledge Based Systems, Inc. (KBSI) is pleased to propose the further design and development of MySidewalk mobile application facilitating the crowd-sourced collection of sidewalk inventory and condition data. The MySidewalk application utilizes advances in social networks and data mining to provide integrated sidewalk datasets. Phase I and II research was facilitated by inputs from City of Colle ...

    SBIR Phase II 2019 Department of Transportation
  5. Wireless Magnetic Workzone System

    SBC: VehicleSense Inc.            Topic: N/A

    In this Phase II we will develop a work zone collision system consisting of "smart barrels" and a central communications computer. The "smart barrels" will incorporate magnetic sensors, an LED display and wireless communications resulting in a unit that can accurately measure the speed of passing vehicles and relay this information to adjacent barrels and the central communications computer. The ...

    SBIR Phase II 2007 Department of Transportation
US Flag An Official Website of the United States Government